Part Number REV00 04/08/2020 79
Self-Contained Recovery/Evacuation
1. Place ice machine rocker in off.
2. Install manifold gauges, scale and recovery unit or two-
stage vacuum pump and open high and low side on
manifold gauges.
RECOVERY/EVACUATION CONNECTIONS
3. Perform recovery or evacuation:
A. Recovery: Operate the recovery unit as directed by
the manufacturer’s instructions.
B. Evacuation prior to recharging: Pull the system
down to 500 microns. Then, allow the pump to run
for an additional half hour. Turn off the pump and
perform a standing vacuum leak check.
4. Follow the Charging Procedures.
Summary of Contents for FB081TF
Page 4: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 24: ...24 Part Number REV00 04 08 2020 Operation Section 3 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 88: ...88 Part Number REV00 04 08 2020 Charts Section 8 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 93: ......
Page 94: ......
Page 95: ......