![Waygate Technologies Krautkramer USM Go Operating Manual Download Page 239](http://html.mh-extra.com/html/waygate-technologies/krautkramer-usm-go/krautkramer-usm-go_operating-manual_878369239.webp)
Data Recorder (option)
6 Documentation
USM Go
Rev. 10 (06/2021)
6-29
Turning the grid matrix on/off
In general, the functions of the grid matrix are automat-
ically turned on when you create a new Data Recorder
file or select a stored Data Recorder file for editing or
viewing.
When the functions of the grid matrix are turned on, you
can display the grid matrix on the first operating level by
briefly pressing the joystick (USM Go) or the center key
of the keypad (USM Go+). It is not possible to switch
over to the zoomed A-scan display mode during this. To
be able to switch to the zoomed A-scan display mode,
you have to turn off the functions of the grid matrix at
first.
Turning the grid matrix off
– Switch to the second operating level.
– In the function group
DR
, select the function
DR
VIEW
.
– Press a function key to set the function to
OFF
. This
turns off the functions of the grid matrix.
Turning the grid matrix on
– Switch to the second operating level.
– In the function group
DR
, select the function
DR
VIEW
.
– Press a function key to set the function to
ON
. This
turns on the functions of the grid matrix.
Summary of Contents for Krautkramer USM Go
Page 1: ...Krautkrämer USM Go USM Go Operating Manual Id No 49 155 Rev 10 06 2021 ...
Page 5: ...USM Go Rev 10 06 2021 0 5 Second operating level ...
Page 6: ...0 6 Rev 10 06 2021 USM Go Second operating level continued ...
Page 10: ...0 10 Rev 10 06 2021 USM Go ...
Page 20: ...0 10 Rev 10 06 2021 USM Go ...
Page 21: ...USM Go Rev 10 06 2021 1 1 Introduction 1 ...
Page 35: ...USM Go Rev 10 06 2021 2 1 Standard package and accessories 2 ...
Page 41: ...USM Go Rev 10 06 2021 3 1 Initial start up 3 ...
Page 53: ...USM Go Rev 10 06 2021 4 1 Principles of operation 4 ...
Page 76: ...4 Principles of operation Saving the settings 4 24 Rev 10 06 2021 USM Go ...
Page 77: ...USM Go Rev 10 06 2021 5 1 Operation 5 ...
Page 210: ...5 Operation Evaluation according to the DGS method 5 134 Rev 10 06 2021 USM Go ...
Page 211: ...USM Go Rev 10 06 2021 6 1 Documentation 6 ...
Page 240: ...6 30 Rev 10 06 2021 USM Go ...
Page 241: ...USM Go Rev 10 06 2021 7 1 Maintenance and care 7 ...
Page 247: ...USM Go Rev 10 06 2021 8 1 Interfaces and Peripherals 8 ...
Page 251: ...USM Go Rev 10 06 2021 9 1 Appendix 9 ...
Page 266: ...9 16 Rev 10 06 2021 USM Go ...
Page 267: ...USM Go Rev 10 06 2021 10 1 Specifications 10 ...
Page 278: ...10 12 Rev 10 06 2021 USM Go ...