5 Operation
Distance-amplitude correction (DAC)
5-100
Rev. 10 (06/2021)
USM Go
Echo evaluation using DAC/TCG
To be able to evaluate a flaw echo by means of the
DAC/TCG, certain conditions must be met:
● The distance-amplitude correction curve has to be re-
corded beforehand.
● It only applies to the same probe that was used for re-
cording the curve. It is not allowed to use even anoth-
er probe of the same type!
● The curve only applies to the material corresponding
to the material of the reference block.
● All functions affecting the echo amplitude must be set
in the same way as they existed during the recording
of the curve. This applies especially to the parame-
ters voltage, frequency, rectification, material veloci-
ty, and reject.
Change in the probe delay with DAC/TCG
Generally, a change in the probe delay automatically
also affects the shape of the sound field. This means
that a new recording of the reference echo would be the-
oretically required. However, minor changes in the de-
lay line, typically occurring due to the wear of the delay
line, have no noticeable effect on the programmed dis-
tance laws.
ATTENTION
A recorded DAC curve no longer applies if
the probe delay changes to a larger extent,
e.g. caused by adding or removing a delay
line after a DAC curve has been recorded.
The same applies to immersion testing: The
DAC curve must be recorded after setting up
the final water delay line.
Failure to do so may lead to evaluation er-
rors.
Summary of Contents for Krautkramer USM Go
Page 1: ...Krautkrämer USM Go USM Go Operating Manual Id No 49 155 Rev 10 06 2021 ...
Page 5: ...USM Go Rev 10 06 2021 0 5 Second operating level ...
Page 6: ...0 6 Rev 10 06 2021 USM Go Second operating level continued ...
Page 10: ...0 10 Rev 10 06 2021 USM Go ...
Page 20: ...0 10 Rev 10 06 2021 USM Go ...
Page 21: ...USM Go Rev 10 06 2021 1 1 Introduction 1 ...
Page 35: ...USM Go Rev 10 06 2021 2 1 Standard package and accessories 2 ...
Page 41: ...USM Go Rev 10 06 2021 3 1 Initial start up 3 ...
Page 53: ...USM Go Rev 10 06 2021 4 1 Principles of operation 4 ...
Page 76: ...4 Principles of operation Saving the settings 4 24 Rev 10 06 2021 USM Go ...
Page 77: ...USM Go Rev 10 06 2021 5 1 Operation 5 ...
Page 210: ...5 Operation Evaluation according to the DGS method 5 134 Rev 10 06 2021 USM Go ...
Page 211: ...USM Go Rev 10 06 2021 6 1 Documentation 6 ...
Page 240: ...6 30 Rev 10 06 2021 USM Go ...
Page 241: ...USM Go Rev 10 06 2021 7 1 Maintenance and care 7 ...
Page 247: ...USM Go Rev 10 06 2021 8 1 Interfaces and Peripherals 8 ...
Page 251: ...USM Go Rev 10 06 2021 9 1 Appendix 9 ...
Page 266: ...9 16 Rev 10 06 2021 USM Go ...
Page 267: ...USM Go Rev 10 06 2021 10 1 Specifications 10 ...
Page 278: ...10 12 Rev 10 06 2021 USM Go ...