Setting the gates (function groups GATE A and GATE B)
5 Operation
USM Go
Rev. 10 (06/2021)
5-25
TOF MODE
The sound path measurement by means of the echo
evaluation depends on the choice of measuring point.
The following settings are possible:
●
PEAK
(peak measurement)
The amplitude and the time-of-flight are measured at
the absolutely highest amplitude value within the gate
with maximum resolution of the instrument.
●
FLANK
(flank measurement)
The amplitude is measured as in the case of
PEAK
,
however, the time-of-flight is measured at the first
point of intersection between the echo and the gate
with maximum resolution of the instrument.
●
J-FLANK
The time-of-flight is measured as in the case of
FLANK
, the amplitude measurement before the 1st
change of direction downwards, when the gate
threshold is afterwards yet again not reached, is de-
termined with the maximum resolution of the instru-
ment. In the case of larger values for the function
RANGE
, it may happen that several points are com-
bined into one. In these cases, the evaluation no lon-
ger corresponds to the displayed A-scan.
●
FIRST PEAK
The measurement is made as in the case of
J-
FLANK
, however, with screen resolution. If the eval-
uation using the displayed A-scan is of prime impor-
tance,
FIRST PEAK
should be preferred.
Summary of Contents for Krautkramer USM Go
Page 1: ...Krautkrämer USM Go USM Go Operating Manual Id No 49 155 Rev 10 06 2021 ...
Page 5: ...USM Go Rev 10 06 2021 0 5 Second operating level ...
Page 6: ...0 6 Rev 10 06 2021 USM Go Second operating level continued ...
Page 10: ...0 10 Rev 10 06 2021 USM Go ...
Page 20: ...0 10 Rev 10 06 2021 USM Go ...
Page 21: ...USM Go Rev 10 06 2021 1 1 Introduction 1 ...
Page 35: ...USM Go Rev 10 06 2021 2 1 Standard package and accessories 2 ...
Page 41: ...USM Go Rev 10 06 2021 3 1 Initial start up 3 ...
Page 53: ...USM Go Rev 10 06 2021 4 1 Principles of operation 4 ...
Page 76: ...4 Principles of operation Saving the settings 4 24 Rev 10 06 2021 USM Go ...
Page 77: ...USM Go Rev 10 06 2021 5 1 Operation 5 ...
Page 210: ...5 Operation Evaluation according to the DGS method 5 134 Rev 10 06 2021 USM Go ...
Page 211: ...USM Go Rev 10 06 2021 6 1 Documentation 6 ...
Page 240: ...6 30 Rev 10 06 2021 USM Go ...
Page 241: ...USM Go Rev 10 06 2021 7 1 Maintenance and care 7 ...
Page 247: ...USM Go Rev 10 06 2021 8 1 Interfaces and Peripherals 8 ...
Page 251: ...USM Go Rev 10 06 2021 9 1 Appendix 9 ...
Page 266: ...9 16 Rev 10 06 2021 USM Go ...
Page 267: ...USM Go Rev 10 06 2021 10 1 Specifications 10 ...
Page 278: ...10 12 Rev 10 06 2021 USM Go ...