5 Operation
Configuring the USM Go for test tasks
5-54
Rev. 10 (06/2021)
USM Go
The following settings are possible:
●
PEAK
(peak measurement)
The amplitude and the time-of-flight are measured at
the absolutely highest amplitude value within the gate
with maximum resolution of the instrument.
●
FLANK
(flank measurement)
The amplitude is measured as in the case of
PEAK
and the time-of-flight is measured at the first point of
intersection between the echo and the gate with max-
imum resolution of the instrument.
●
J-FLANK
The time-of-flight is measured as in the case of
FLANK
, the amplitude measurement from the 1st
change of direction downwards if the gate threshold
is afterwards not reached yet another time.
●
FIRST PEAK
The measurement is made as in the case of
J-FLANK
, however, with screen resolution.
ATTENTION
The highest echo in the gate does not have
to be identical with the echo for which the
sound path is measured. This can lead to
evaluation errors!
Two measurement arrows are used in order to clearly
identify readings and to avoid any misinterpretations.
The display shows
● the position at which the sound path (distance) is
measured: arrowhead downwards, and
● where the amplitude is measured: arrowhead up-
wards.
In addition to the measurement reading, the TOF mode
measuring point (peak or flank) is displayed with a sym-
bol in the measurement line in sound path measure-
ments:
^ = measuring point Peak
/ = measuring point Flank
Examples:
SA^
= sound path within gate A, measuring point Peak
SA/
= sound path within gate A, measuring point Flank
Summary of Contents for Krautkramer USM Go
Page 1: ...Krautkrämer USM Go USM Go Operating Manual Id No 49 155 Rev 10 06 2021 ...
Page 5: ...USM Go Rev 10 06 2021 0 5 Second operating level ...
Page 6: ...0 6 Rev 10 06 2021 USM Go Second operating level continued ...
Page 10: ...0 10 Rev 10 06 2021 USM Go ...
Page 20: ...0 10 Rev 10 06 2021 USM Go ...
Page 21: ...USM Go Rev 10 06 2021 1 1 Introduction 1 ...
Page 35: ...USM Go Rev 10 06 2021 2 1 Standard package and accessories 2 ...
Page 41: ...USM Go Rev 10 06 2021 3 1 Initial start up 3 ...
Page 53: ...USM Go Rev 10 06 2021 4 1 Principles of operation 4 ...
Page 76: ...4 Principles of operation Saving the settings 4 24 Rev 10 06 2021 USM Go ...
Page 77: ...USM Go Rev 10 06 2021 5 1 Operation 5 ...
Page 210: ...5 Operation Evaluation according to the DGS method 5 134 Rev 10 06 2021 USM Go ...
Page 211: ...USM Go Rev 10 06 2021 6 1 Documentation 6 ...
Page 240: ...6 30 Rev 10 06 2021 USM Go ...
Page 241: ...USM Go Rev 10 06 2021 7 1 Maintenance and care 7 ...
Page 247: ...USM Go Rev 10 06 2021 8 1 Interfaces and Peripherals 8 ...
Page 251: ...USM Go Rev 10 06 2021 9 1 Appendix 9 ...
Page 266: ...9 16 Rev 10 06 2021 USM Go ...
Page 267: ...USM Go Rev 10 06 2021 10 1 Specifications 10 ...
Page 278: ...10 12 Rev 10 06 2021 USM Go ...