6 Documentation
Data Recorder (option)
6-24
Rev. 10 (06/2021)
USM Go
– Press the joystick (USM Go) or the center key of the
keypad (USM Go+) briefly to close the filename en-
try.
– Switch to the function
TOP
and briefly press the joy-
stick (USM Go) or the center key of the keypad
(USM Go+).
– Select the coordinates for the first cell in the top left
corner of the grid matrix. The choice of the option
1A
means that the column names start with
1
and the
row names with
A
.
– Press the joystick (USM Go) or the center key of the
keypad (USM Go+) briefly to close the selection.
– Switch to the function
BOTTOM
and briefly press the
joystick (USM Go) or the center key of the keypad
(USM Go+).
– Select the coordinates for the last cell in the bottom
right corner of the grid matrix. The choice of the op-
tion
4H
means that
4
columns and 8 rows (
A
to
H
) are
created.
– Press the joystick (USM Go) or the center key of the
keypad (USM Go+) briefly to close the selection.
– Switch to the function
ADV DIRECTION
and press
the function keys to select the automatic filling ad-
vance direction for the grid matrix.
– Switch to the function
DR THICKNESS
and press the
function keys to select the measuring method (for ex-
ample
SA
= sound path in the gate A).
– Switch to the function
CREATE
and briefly press the
joystick (USM Go) or the center key of the keypad
(USM Go+). The Data Recorder file is created.
Summary of Contents for Krautkramer USM Go
Page 1: ...Krautkrämer USM Go USM Go Operating Manual Id No 49 155 Rev 10 06 2021 ...
Page 5: ...USM Go Rev 10 06 2021 0 5 Second operating level ...
Page 6: ...0 6 Rev 10 06 2021 USM Go Second operating level continued ...
Page 10: ...0 10 Rev 10 06 2021 USM Go ...
Page 20: ...0 10 Rev 10 06 2021 USM Go ...
Page 21: ...USM Go Rev 10 06 2021 1 1 Introduction 1 ...
Page 35: ...USM Go Rev 10 06 2021 2 1 Standard package and accessories 2 ...
Page 41: ...USM Go Rev 10 06 2021 3 1 Initial start up 3 ...
Page 53: ...USM Go Rev 10 06 2021 4 1 Principles of operation 4 ...
Page 76: ...4 Principles of operation Saving the settings 4 24 Rev 10 06 2021 USM Go ...
Page 77: ...USM Go Rev 10 06 2021 5 1 Operation 5 ...
Page 210: ...5 Operation Evaluation according to the DGS method 5 134 Rev 10 06 2021 USM Go ...
Page 211: ...USM Go Rev 10 06 2021 6 1 Documentation 6 ...
Page 240: ...6 30 Rev 10 06 2021 USM Go ...
Page 241: ...USM Go Rev 10 06 2021 7 1 Maintenance and care 7 ...
Page 247: ...USM Go Rev 10 06 2021 8 1 Interfaces and Peripherals 8 ...
Page 251: ...USM Go Rev 10 06 2021 9 1 Appendix 9 ...
Page 266: ...9 16 Rev 10 06 2021 USM Go ...
Page 267: ...USM Go Rev 10 06 2021 10 1 Specifications 10 ...
Page 278: ...10 12 Rev 10 06 2021 USM Go ...