![Waygate Technologies Krautkramer USM Go Operating Manual Download Page 205](http://html.mh-extra.com/html/waygate-technologies/krautkramer-usm-go/krautkramer-usm-go_operating-manual_878369205.webp)
Evaluation according to the DGS method
5 Operation
USM Go
Rev. 10 (06/2021)
5-129
Turning the DGS evaluation off
You can turn the DGS evaluation off at any time.
– Switch to the first operating level.
– Select the function group
DGS
.
– Use the navigation to move
upwards
in order to dis-
play the specific function groups and functions for the
DGS.
– Select the function group
SETUP
.
– Select the function
DGS MODE
and press a function
key to turn the DGS evaluation off (
OFF
). The DGS
curve is no longer displayed in the A-scan.
Note
The DGS calibration is not lost by turning the
function off. By turning it on again, you can
use the function
DGS MODE
to go back to
the DGS evaluation again without losing any
settings.
Deleting a DGS reference echo
You can delete the echo of the reference reflector. After
this, the DGS evaluation is not possible until you have
recorded a new reference echo.
– Switch to the first operating level.
– Select the function group
DGS
.
– Use the navigation to move
upwards
in order to dis-
play the specific function groups and functions for the
DGS.
– Select the function group
REF CORR
.
– Select the function
DELETE REF
and press a func-
tion key. A message prompting you to confirm is dis-
played.
– Press the two function keys at the same time to con-
firm the deletion of the reference echo. The deletion
is acknowledged by the indication
(NO REF)
.
Summary of Contents for Krautkramer USM Go
Page 1: ...Krautkrämer USM Go USM Go Operating Manual Id No 49 155 Rev 10 06 2021 ...
Page 5: ...USM Go Rev 10 06 2021 0 5 Second operating level ...
Page 6: ...0 6 Rev 10 06 2021 USM Go Second operating level continued ...
Page 10: ...0 10 Rev 10 06 2021 USM Go ...
Page 20: ...0 10 Rev 10 06 2021 USM Go ...
Page 21: ...USM Go Rev 10 06 2021 1 1 Introduction 1 ...
Page 35: ...USM Go Rev 10 06 2021 2 1 Standard package and accessories 2 ...
Page 41: ...USM Go Rev 10 06 2021 3 1 Initial start up 3 ...
Page 53: ...USM Go Rev 10 06 2021 4 1 Principles of operation 4 ...
Page 76: ...4 Principles of operation Saving the settings 4 24 Rev 10 06 2021 USM Go ...
Page 77: ...USM Go Rev 10 06 2021 5 1 Operation 5 ...
Page 210: ...5 Operation Evaluation according to the DGS method 5 134 Rev 10 06 2021 USM Go ...
Page 211: ...USM Go Rev 10 06 2021 6 1 Documentation 6 ...
Page 240: ...6 30 Rev 10 06 2021 USM Go ...
Page 241: ...USM Go Rev 10 06 2021 7 1 Maintenance and care 7 ...
Page 247: ...USM Go Rev 10 06 2021 8 1 Interfaces and Peripherals 8 ...
Page 251: ...USM Go Rev 10 06 2021 9 1 Appendix 9 ...
Page 266: ...9 16 Rev 10 06 2021 USM Go ...
Page 267: ...USM Go Rev 10 06 2021 10 1 Specifications 10 ...
Page 278: ...10 12 Rev 10 06 2021 USM Go ...