Centurion Water Heater- Edge [ii]: Install-Operation-Service
SECTION 8: WATER HEATER MANAGEMENT
OMM-0153_A
• 8/25/2022 Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST Page 87 of 131
8.7.4 Control And Power Wiring
Control and power wiring connections to the Sequencing Valves associated with each Edge
WHM unit is accomplished by simply ensuring that the 4-pin Molex connectors on the units are
connected to the corresponding connectors on the valves.
Figure 8-12: WHM Network Wiring Diagram
Reference SD-A-878
rev F