OMM-0153_A
• 8/25/2022 Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST Page 3 of 131
Installation, Operation & Maintenance Manual
Centurion Water Heater
5.2 TOOLS & INSTRUMENTS FOR COMBUSTION CALIBRATION ........................................43
5.2.1 Required Tools & Instrumentation ................................................................................................. 43
5.2.2 Installing Gas Supply Manometer .................................................................................................. 43
5.2.3 Accessing The Analyzer Probe Port ................................................................................................ 44
5.2.4 Recommendations For WHM Operation........................................................................................ 44
5.3.1 Instructions For Combustion Calibration ....................................................................................... 45
5.3.2 Reassembly ..................................................................................................................................... 48
5.4.1 Adjusting The Automatic Reset Limit Switch Temperature ........................................................... 49
5.4.2 Resetting The Manual Reset Limit Switch ...................................................................................... 49
5.4.3 Changing The Readout Between Fahrenheit and Celsius............................................................... 50
5.5.1 Setting The Outlet Water Temperature Setpoint........................................................................... 50
5.5.2 Minimum Load Adjustment ............................................................................................................ 51
5.5.3 Maximum Load Adjustment ........................................................................................................... 52
5.6.1 Constant Setpoint Mode ................................................................................................................ 52
5.6.2 Remote Setpoint Mode .................................................................................................................. 53
SECTION 6: SAFETY DEVICE TESTING................................................................. 54
6.8 AIR FLOW FAULT TESTS-BLOWER PROOF & BLOCKED INLET SWITCHES ................61
6.8.1 Blower Proof Switch Test ............................................................................................................... 61
6.8.2 Blocked Inlet Switch Test................................................................................................................ 62
7.9 SHUTTING WATER HEATER DOWN FOR EXTENDED PERIOD .....................................72