Centurion Water Heater- Edge [ii]: Install-Operation-Service
SECTION 2: INSTALLATION
OMM-0153_A
• 8/25/2022 Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST Page 16 of 131
.
Figure 2-3: Condensate Neutralizer Tank Installation
2.4 LIFTING PROVISIONS
W A R N I N G !
DO NOT
attempt to lift or move Water Heater using the gas train or blower.
Three lifting lugs are attached to the top of the heat exchanger, as shown below. Remove the
front and rear top panels from the unit to access the lifting lugs. Remove the four (4) lag screws
securing the unit to the shipping skid. Lift the unit off the shipping skid and position it on the
(required) concrete
“housekeeping” pad.
Trap
Support
Housekeeping
Pad
Condensate
Neutralizer
Figure 2-4: Water Heater Lifting Lug Locations
Water Heater