
Maintenance schedule
December 6, 2012, 71500126802IVD Rev. C
55
Maintenance schedule
The following table lists periodic maintenance schedules that ensure optimum
instrument performance.
The maintenance frequencies shown apply to instruments that normally
receive moderate use.
Maintenance schedule
Procedure
Frequency
For information...
Clean the instrument case.
As required.
.
Empty the exhaust trap bottle
in the instrument exhaust
line.
Check daily, empty as
required.
.
Empty the liquid trap bottle
in the roughing pump exhaust
line.
Check daily, empty as
required.
.
Gas ballast the roughing
pump.
ESI – weekly;
.
Inspect and adjust the
roughing pump oil level.
Weekly.
.
Clean the source components. When sensitivity
decreases to
unacceptable levels.
.
Clean or replace the ESI
probe tip.
When sensitivity
decreases to
unacceptable levels.
.
Replace the ESI probe
capillary.
When sensitivity
decreases to
unacceptable levels or
sample flow is
inconsistent.
.
Replace the ion block heater
cartridge.
If the heater fails to
heat when the
instrument is pumped
down (evacuated).
.
Replace the source assembly
seals.
Annually.
See
.
Summary of Contents for TQ
Page 34: ...1 Waters TQ Detector 34 December 6 2012 71500126802IVD Rev C...
Page 144: ...4 Maintenance Procedures 144 December 6 2012 71500126802IVD Rev C...
Page 156: ...A Safety Advisories 156 December 6 2012 71500126802IVD Rev C...
Page 188: ...B External Connections 188 December 6 2012 71500126802IVD Rev C...
Page 192: ...C Materials of Construction and Compliant Solvents 192 December 6 2012 71500126802IVD Rev C...