
4 Maintenance Procedures
84
December 6, 2012, 71500126802IVD Rev. C
Cleaning the ion block, isolation valve, and extraction
cone
The ion block and extraction cone must be cleaned if cleaning the sample cone
and gas cone fails to increase signal sensitivity.
Removing the ion block assembly from the source assembly
Required materials:
•
Chemical-resistant, powder-free gloves
•
6-mm Allen wrench
To remove the ion block assembly
1. Vent and shut-down the instrument (see the mass spectrometer’s online
Help for details).
2. Open the instrument’s access door.
3. Open the source enclosure door by releasing both spring-clips and
lowering the door towards you.
4. Close the source isolation valve (see
).
5. Disconnect the PTFE tube from the cone gas assembly connection tube.
Warning:
The source components can be contaminated with
biohazardous and/or toxic materials. Always wear
chemical-resistant, powder-free gloves while performing this
procedure.
Warning:
The source can be hot. To avoid burn injuries, allow it
to cool for at least 30 minutes before proceeding.
Warning:
To avoid puncture wounds, take great care while
working with the source enclosure door open if an ESI probe is
fitted (the probe tip is sharp).
Caution:
Do not apply any downward force to the source
enclosure door while the door is open.
Summary of Contents for TQ
Page 34: ...1 Waters TQ Detector 34 December 6 2012 71500126802IVD Rev C...
Page 144: ...4 Maintenance Procedures 144 December 6 2012 71500126802IVD Rev C...
Page 156: ...A Safety Advisories 156 December 6 2012 71500126802IVD Rev C...
Page 188: ...B External Connections 188 December 6 2012 71500126802IVD Rev C...
Page 192: ...C Materials of Construction and Compliant Solvents 192 December 6 2012 71500126802IVD Rev C...