
Preparing the instrument for work performed on the source
December 6, 2012, 71500126802IVD Rev. C
59
Preparing the instrument for work performed on the
source
For safety reasons, you must follow the procedure described below before
working on the source (for example, when changing the probe, operating the
source isolation valve, or maintaining the source).
To prepare the instrument
1. In the Instrument Console, click Stop Flow
to stop the LC flow or, if
column flow is required, divert the LC flow to waste as follows:
a. In the Instrument Console system tree, expand TQ Detector,
Interactive Fluidics.
b. Click Control
.
c.
Select Waste as the flow state.
2. In the Instrument Console, click Standby
, and confirm that the
Operate indicator is not illuminated.
3. Wait 3 minutes to allow the desolvation gas flow to cool the probe and
source.
4. In the Instrument Console, click API
to stop the desolvation gas
flow.
Summary of Contents for TQ
Page 34: ...1 Waters TQ Detector 34 December 6 2012 71500126802IVD Rev C...
Page 144: ...4 Maintenance Procedures 144 December 6 2012 71500126802IVD Rev C...
Page 156: ...A Safety Advisories 156 December 6 2012 71500126802IVD Rev C...
Page 188: ...B External Connections 188 December 6 2012 71500126802IVD Rev C...
Page 192: ...C Materials of Construction and Compliant Solvents 192 December 6 2012 71500126802IVD Rev C...