
B External Connections
174
December 6, 2012, 71500126802IVD Rev. C
Connecting to the nitrogen gas supply
Required materials:
•
Chemical-resistant, powder-free gloves
•
Sharp knife
•
Wrench
•
6-mm PTFE tubing (included in the Waters Rough Pump Connect Kit)
To connect the nitrogen gas supply
1. Use the sharp knife to cut a 3.8 to 5.0-cm (1.5 to 2-inch) length of 6-mm
PTFE tubing.
2. Connect this piece of tubing to one end of the nitrogen supply in-line
filter.
3. Connect the remaining length of the 6-mm PTFE tubing to the other end
of the filter.
4. Connect the free end of the short piece of 6-mm PTFE tubing to the
nitrogen inlet port on the rear of the instrument.
Caution:
To avoid gas leaks, use the sharp knife to cut the PTFE
tubing squarely (that is, perpendicular to its horizontal axis).
Summary of Contents for TQ
Page 34: ...1 Waters TQ Detector 34 December 6 2012 71500126802IVD Rev C...
Page 144: ...4 Maintenance Procedures 144 December 6 2012 71500126802IVD Rev C...
Page 156: ...A Safety Advisories 156 December 6 2012 71500126802IVD Rev C...
Page 188: ...B External Connections 188 December 6 2012 71500126802IVD Rev C...
Page 192: ...C Materials of Construction and Compliant Solvents 192 December 6 2012 71500126802IVD Rev C...