Maintenance
9
Maintenance
9.1
Periodic Maintenance Schedule—Oil Burners
The table below lists basic machine maintenance. Tasks designated with check
marks may be performed by the operator. Tasks designated with square bullet
points require special training and equipment.
Task
Interval*
(hours of service)
Daily
6 Months
Yearly
---
(1000)
(1200)
Check fuel level.
Clean the machine.
Inspect electrical components.
Inspect the blower motor and belt.
Replace the belt if necessary.
Inspect the heat exchangers.
Replace the burner nozzle.
Replace the fuel filter.
Clean the CAD cell.
Lubricate the pillow block bearings.
1
Inspect and test the burner.
As needed or upon changing job sites;
see chapter
Burner Setup
.
■
Inspect burner electrodes; replace burner
electrodes if necessary.
■
Check the “Z” distance.
■
Check the air settings.
■
Check the fuel pressure.
* Use whichever comes first, calendar time or service hours.
1
Adjust frequency depending on work site and operating conditions.
Summary of Contents for HI750 Series
Page 6: ...ghi_tx001257gb_FM10 fm 6 Foreword HI750 ...
Page 27: ...HI750 Labels ghi_si000380gb_FM10 fm 27 BB CC FF ...
Page 115: ...wc_tx003699gb_FM10 fm 115 Kubota Genset Genset Maintenance ...
Page 122: ...ghi_td000360gb_FM10 fm 122 Technical Data HI750 Notes ...
Page 142: ......
Page 143: ......