Operation
HI750
4.5
Control Panel
4.6
General Sequence of Operation
Follow the sequence of operation below. Refer to the specific topic for details.
Ref.
Description
Ref.
Description
a
Start button
d
Voltage output meter
b
Control switch
e
Pressure gauge
c
Hour meter
—
—
Task
See Topic
1. Position the machine.
4.7
2. Connect power.
4.10
3. Connect gas line (if applicable).
4.11
4. Connect venting.
4.12
5. Connect ducting.
4.14
6. Perform
Before Starting
checks.
4.15
7. Connect the remote thermostat (if equipped).
4.16
8. Start the generator (if equipped).
4.17
9. Start the machine.
4.18
10.Monitor the operating parameters.
4.21
11. Adjust the air output volume.
4.24
12.Adjust the recirculation damper.
4.25
13.Stop the machine.
4.19
Summary of Contents for HI750 Series
Page 6: ...ghi_tx001257gb_FM10 fm 6 Foreword HI750 ...
Page 27: ...HI750 Labels ghi_si000380gb_FM10 fm 27 BB CC FF ...
Page 115: ...wc_tx003699gb_FM10 fm 115 Kubota Genset Genset Maintenance ...
Page 122: ...ghi_td000360gb_FM10 fm 122 Technical Data HI750 Notes ...
Page 142: ......
Page 143: ......