
wc_tx001396gb_FM10.fm
88
Burner Setup—Gas
HI750
8.8
Checking the Supply Gas Pressure
Requirements
■
Machine shut down
■
Supply gas turned off
■
Manometer
■
Nipple
Checking
pressure
Perform the procedure below to check and adjust the supply gas pressure.
1. Shut down the machine and allow it to cool.
2. Close the supply gas shutoff valve.
3. Remove the plug
(a)
from the Tee fitting using a hex key.
4. Install a nipple
(b)
into the Tee fitting.
5. Connect the hose of the manometer
(c)
to the nipple.
6. Open the supply gas shutoff valve.
This procedure continues on the next page.
WARNING
Explosion and fire hazard. When combined with air, the gas used for this burner is
explosive. Explosions can cause severe injury or death.
►
Close the supply gas shutoff valve before continuing with this procedure.
►
Extinguish all sources of ignition before continuing this procedure.
a
ghi_gr007058
b
ghi_gr007059
c
ghi_gr007060
Summary of Contents for HI750 Series
Page 6: ...ghi_tx001257gb_FM10 fm 6 Foreword HI750 ...
Page 27: ...HI750 Labels ghi_si000380gb_FM10 fm 27 BB CC FF ...
Page 115: ...wc_tx003699gb_FM10 fm 115 Kubota Genset Genset Maintenance ...
Page 122: ...ghi_td000360gb_FM10 fm 122 Technical Data HI750 Notes ...
Page 142: ......
Page 143: ......