05TA Service Manual
INDEX
4/15/14
12-2
H (Cont.)
High Head Pressure (Air-Cooled) -------------------------- 9-6
High Head Pressure (Water Cooled) ---------------------- 9-5
High/Low Pressure Switch ----------------------------------- 9-4
History, Tube-Ice®---------------------------------------------- 1-1
HMI, Interface --------------------------------------------------- 10-5
Hub, Cutter Drive Gear --------------------------------------- 9-23
I
Ice Bin Thermostat Location -------------------------------- 3-15
Ice Capacity ---------------------------------------------------- 11-4
Ice-Making Section --------------------------------------------- 7-1
Important Safety Notice --------------------------------------- 1-2
Inspection, First Arrival ---------------------------------------- 2-1
Installation -------------------------------------------------------- 3-1
Installation Review: A Checklist ---------------------------- 3-17
Introduction ------------------------------------------------------- 1-1
J, K
L
Low Compressor Oil Level ----------------------------------- 8-7
Low Ice Capacity ------------------------------------------------ 8-6
Low Pressure Switch ------------------------------------------- 9-4
Lubrication -------------------------------------------------- 7-6,7-7
Lubrication, Compressor --------------------------------- 7-6,7-7
Lubrication, Cutter Gear Reducer -------------------------- 7-7
M
Machine Ratings (50 Hz., 12 HP)-------------------------- 11-3
Machine Ratings (60 Hz., 10 HP)-------------------------- 11-2
Machine Room--------------------------------------------------- 2-1
Machine Won’t Run -------------------------------------- 8-2, 8-3
Maintenance ------------------------------------------------------ 7-1
Maintenance Program ----------------------------------------- 7-8
Make-Up Water -------------------------------------------------- 3-1
Manual Harvest Push Button -------------------- 5-3, 5-5, 6-3
Metric Conversion---------------------------------------------- 11-8
Mechanical Cleaning ------------------------------------------- 7-5
N
Nomenclature, Piping Schematic ----------------- 4-2,4-3,4-4
Non-Condensable Gases ------------------------------------ 9-18
Normal Operating Vitals -------------------------------------- 11-5
Note To Manager ----------------------------------------------- 7-8
O
Oil Pressure Safety Control --------------------------------- 9-11
Oil Separator ----------------------------------------------------- 9-7
Operating Tips --------------------------------------------------- 5-5
Operation Vitals ------------------------------------------------ 11-5
P
Phase Check ----------------------------------------------------- 3-6
Pin, Stainless Steel ------------------------------------ 9-22, 9-24
Piping and Drain Connections ------------------------------- 3-1
Piping Schematic, Nomenclature --------------------------- 4-2
Piping Schematic, Water-cooled, Air-cooled ----------- 4-3, 4-4
PLC (Programmable Logic Controller) --------------- 10-4,10-64
Poor Ice Quality ------------------------------------------------------- 8-8
Power Connection ---------------------------------------------------- 3-5
Power Monitor ----------------------------------------- 10-1,10-2, 10-3
Preventive Maintenance -------------------------------------------- 7-8
Preventive Maintenance Program ----------------------------- 7-10
Preview ------------------------------------------------------------------ 1-1
Principle of Operation ----------------------------------------------- 4-1
Pumpdown ----------------------------------------------------------- 9-17
Pump, Contactor ----------------------------------------------------- 6-4
Q
R
R-22 (HCFC-22) ------------------------------------------ 1-2, 2-2, 5-1
R-404a (HFC “SUVA” HP62) -------------------------- 1-2, 2-2, 5-1
Receipt of Machine -------------------------------------------------- 2-1
Receiver ---------------------------------------------------------------- 4-1
Refrigerant, Charge -------------------------------------- 1-2, 5-1, 5-4
Refrigerant, Leaks ------------------------------------------------- 9-18
Refrigerant, Removal ---------------------------------------------- 9-18
Refrigeration System Review ------------------------------------- 5-1
Rotation (Phase) Check -------------------------------------------- 3-5
S
Safety Notice ---------------------------------------------------------- 1-2
Safety Symbols and What They Mean ------------------------- 1-3
Safety Valves ---------------------------------------------------------- 2-1
Sanitizing Procedure ------------------------------------------------ 7-2
Sentronic Oil Pressure Safety Switch------------------ 9-11, 9-12
Shipping Papers ------------------------------------------------------ 2-1
Solenoid Valve --------------------------------------------------- 9-6,9-7
Space Diagram (Air-Cooled Machine) -------------------------- 3-3
Space Diagram (Water Cooled Machine) --------------------- 3-4
Special Precautions ------------------------------------------------- 1-2
Start Push Button (PB1) --------------------------- 5-3, 5-5, 6-1,6-3
Start-Up ----------------------------------------------------------------- 5-3
Start-Up Checklist ---------------------------------------------------- 5-2
Storage (prior to installation and start-up) --------------------- 2-2
Suction Cut-Off Unloader ---------------------------------------- 9-20
Symptoms, Troubleshooting -------------------------------------- 8-1
T
Technical Service Bulletin (Water Quality) ----------------- 9-27
Telephone Number, Vogt ------------------------------------------ 1-1
Temperature-Pressure Chart ----------------------------------- 11-7
Thawing, Chamber --------------------------------------------------- 4-1
Thawing, Timer (T) ------------------------------------------- 6-5, 9-16
Thermostat, Bin Installation ------------------------------------- 3-15
Thermostat, Wiring ------------------------------------------------ 3-16
Timer, Thawing ----------------------------------------------- 6-3, 9-16
Trap (AC Piping) ---------------------------------------------------- 3-12
Troubleshooting ------------------------------------------------------- 8-1
U
Unloader - Loaded Operation (Freeze Period) ------------ 9-20
Unloader - Unloaded Operation (Harvest Period) -------- 9-20
Summary of Contents for P118F/HE100
Page 4: ...Vogt Tube Ice Machines Installation Service Manual and Parts Catalog 12A4171M06 05TA Model ...
Page 10: ...05TA Service Manual TABLE OF CONTENTS vi ...
Page 20: ...05TA Service Manual INTRODUCTION 7 19 13 1 10 ...
Page 40: ...05TA Service Manual INSTALLING YOUR TUBE ICE MACHINE 3 7 14 3 18 BLANK PAGE ...
Page 50: ...5 6 5TA Service Manual START UP AND OPERATION 7 19 13 Blank page ...
Page 106: ...05TA Service Manual SERVICE OPERATIONS 3 10 14 9 28 Blank ...
Page 114: ...Blank page ...
Page 115: ...05TA Service Manual TABLES CHARTS 3 10 14 11 1 11 Tables Charts ...