05TA Service Manual
INDEX
4/15/14
12-1
12.
Index
A
A Valve (Liquid Feed) ----------------------------- 4-1, 5-1, 9-7
Accumulator ----------------------------------------------- 4-1, 5-1
Adding Refrigerant ---------------------------------------------- 5-4
Air - cooled Condenser Wiring (3 phase) --------------- 3-12
Air-Cooled Condenser ---------------------------------------- 9-17
Air-Cooled Condenser Data ---------------------------------- 3-9
Air-Cooled Condenser Installation -------------------------- 3-7
Air-Cooled Piping Schematic -------------------------------- 4-4
Air-Cooled Units ------------------------------------------------- 9-5
Allen-Bradley Switch ------------------------------------------- 9-3
Assembly Drawing, Air-Cooled ------------------ 1-4, 1-5, 1-6
Assembly Drawing, Water Cooled ------------- 1-7, 1-8, 1-9
Automatic blowdown ------------------------------------------- 9-1
B
Basic Product Warranty -------------------- inside back cover
Bearing, Cutter -------------------------------------------------- 9-21
Bill of Lading ------------------------------------------------------ 2-1
Bin, Thermostat Installation --------------------------------- 3-15
Blowdown -------------------------------------------------------- 9-1
Burnout, Compressor ----------------------------------------- 9-19
C
Capacity Control Valve (Unloader) ------------------------ 9-20
Capacity Ratings ----------------------------------------------- 11-4
Centrifugal Pump ---------------------------------------------- 9-15
Charging Refrigeration Systems ---------------------- 1-2, 5-4
Check Valve ------------------------------------------------------ 4-2
Checklist, Daily -------------------------------------------------- 7-8
Checklist, Installation Review ------------------------------- 3-17
Checklist, Start-up ---------------------------------------------- 5-2
Chemical Cleaning --------------------------------------------- 7-5
Circuit Breaker, Control --------------------------------------- 6-2
Circulating Water Pump Motor ----------------------------- 9-15
Clean / Off / Ice Switch ---------------------------------- 5-3, 6-3
Cleaning Procedure -------------------------------------------- 7-1
Compressor ------------------------------------------------------ 7-6
Compressor Crankcase Heater ----------------------------- 9-8
Compressor Lubrication --------------------------------------- 7-6
Compressor Motor Burnout --------------------------------- 9-19
Compressor Unloader ---------------------------------------- 9-20
Compressor, Contactor----------------------------------- 6-2,6-4
Compressor, Motor Protection ------------------------------ 9-9
Condenser Cleaning ------------------------------------ 7-5, 9-17
Condenser Fan Contactor (FC) ----------------------------- 6-3
Condenser Fan Switch ---------------------------------------- 9-5
Condenser Piping (Cold Weather Valve Kit) ----------- 3-11
Condenser Water Usage ------------------------------------ 11-5
Condenser, Air-cooled Cleaning --------------------------- 9-17
Condenser, Air-cooled Heat Rejection -------------------- 3-9
Condenser, Fan Switch (CPS) ----------------------------- 9-5
Condenser, Water Cooled Maintenance ------------------ 7-3
Control Circuit Protection ------------------------------------ 9-14
Control Panel ---------------------------------------------------------- 6-1
Control Panel Parts -------------------------------------------------- 6-5
Control, Relay (CR) -------------------------------------------------- 6-3
Cooling Tower --------------------------------------------------------- 3-2
CoreSense ---------------------------------------------- 6-8, 9-13, 9-14
Crankcase Heater -------------------------------------------- 7-6, 9-14
Crushed Ice Production------------------------------------------- 9-25
Current Unbalance -------------------------------------------------- 3-6
Cutter & Bearing Removal/Installation------------------------ 9-22
Cutter, Assembly --------------------------------------------------- 9-23
Cutter, Bearing --------------------------------------- 9-21, 9-22, 9-23
Cutter, Bearing Support ----------------------------------- 9-21, 9-22
Cutter, Disc Assembly -------------------------------------------- 9-22
Cutter, Drive Parts ------------------------------------------------- 9-23
Cutter, Gear Reducer ------------------------ 7-7, 9-13, 9-21, 9-22
Cutter, Housing Assembly --------------------------------------- 9-23
Cutter, Motor --------------------------------------------------------- 9-21
Cutter Parts (crushed Ice) --------------------------------------- 9-25
Cutter/Water Tank Parts (cylinder ice) ----------------------- 9-24
D
D Valve (Thawing Gas) --------------------------------- 4-1, 5-1,9-7
Daily Check List ------------------------------------------------------ 7-8
Drive gear ------------------------------------------------------------ 9-23
E
Electrical Connection ------------------------------------------------ 3-5
Electrical Schematic All Voltages 50-60 Hz. ------------------ 6-7
Electrical, Controls --------------------------------------------------- 6-2
Electronic Motor Protector -------------------------- 9-9, 9-10, 9-11
Energy Saving --------------------------------------------------------- 1-1
Equivalent Feet Due To Friction, Worksheet --------------- 3-12
F
Fan Contactor (FC) -------------------------------------------------- 6-4
Filter/Drier -------------------------------------------------------------- 4-1
Float Switch ------------------------------------------------------------ 9-2
Float Valve (Make-Up Water) ------------------------------------- 9-1
Freeze Period --------------------------------------------------------- 4-2
Freeze-Up Due To Extended Freezing Period --------------- 8-4
Freeze-Up Due To Ice Failing To Discharge------------------ 8-5
Freezer ------------------------------------------------------------------ 4-1
Freezer Pressure Switch ------------------------------------------- 9-3
G
Gear Reducer ---------------------------------- 7-7, 9-13, 9-19, 9-22
H
Hand Expansion Valve ---------------------------------------------- 9-3
Harvest Period -------------------------------------------------------- 4-2
Head Pressure -------------------------------------------------------- 9-4
Heat Exchanger ------------------------------------------------------- 4-1
Heater, Crankcase --------------------------------------------------- 9-8
Summary of Contents for P118F/HE100
Page 4: ...Vogt Tube Ice Machines Installation Service Manual and Parts Catalog 12A4171M06 05TA Model ...
Page 10: ...05TA Service Manual TABLE OF CONTENTS vi ...
Page 20: ...05TA Service Manual INTRODUCTION 7 19 13 1 10 ...
Page 40: ...05TA Service Manual INSTALLING YOUR TUBE ICE MACHINE 3 7 14 3 18 BLANK PAGE ...
Page 50: ...5 6 5TA Service Manual START UP AND OPERATION 7 19 13 Blank page ...
Page 106: ...05TA Service Manual SERVICE OPERATIONS 3 10 14 9 28 Blank ...
Page 114: ...Blank page ...
Page 115: ...05TA Service Manual TABLES CHARTS 3 10 14 11 1 11 Tables Charts ...