Feature Upgrade Procedure
2-55
Figure 2-29: DHS Components
SW1 must remain in the ON position following initialization to engage customer database
RAM memory backup in the event of commercial/utility power outage. RAM backup battery
charging occurs only when SW1 is in the ON position. The RAM battery requires 14 hr min.
normal (powered) system operation for adequate charging.
AC Power
Transformer
117/230V AC
Option Module
Connector
Standard MOH
BGM Module
1/8 in. Phono Jack
for MOH/BGM
CPU Module
3 x 8 Module
AC Fuse
Power Switch
Power Heartbeat LED
Initialization
Switch SW1
25 Pair Champ
Connector
Cable Clamp
Tie-down Posts
DC Fuse
Spare
Fuses (2)
System
Software
Eprom
Socket U9
Power Connector
Bus Connectors
JP2, JP3, and JP4
Summary of Contents for Starplus DHS
Page 17: ......
Page 21: ...1 4 Toll Fraud and DISA Disclaimer...
Page 23: ......
Page 79: ...2 56 Feature Upgrade Procedure...
Page 81: ......
Page 121: ......
Page 227: ......
Page 249: ......
Page 293: ......
Page 303: ......
Page 326: ...B Part Numbers...
Page 327: ......
Page 329: ...B 2...
Page 337: ...xx January 2000 Index...