218
5790 733 - 07
Vitocrossal 300 CA3 Series 2.5 to 6.0 Installation/Service
Technical Data
Specifications
Boiler Model
CA3
2.5
3.0
3.5
4.0
5.0
6.0
Input
MBH
(kW)
2500
(733)
3000
(879)
3500
(1026)
4000
(1172)
5000
(1465)
6000
(1758)
Minimum Input
MBH
(kW)
250
(73)
300
(88)
300
(88)
400
(117)
300
(88)
400
(117)
Output (thermal efficiency)
MBH
(kW)
2402
(703)
2883
(844)
3363
(985)
3844
(1126)
4805
(1408)
5766
(1689)
Output (combustion efficiency)
MBH
(kW)
2352
(689)
2832
(830)
3294
(965)
3764
(1103)
4705
(1379)
5646
(1655)
Net AHRI Rating
MBH
(kW)
2089
(611)
2506
(734)
2924
(856)
3342
(979)
4178
(1224)
5013
(1469)
Combustion efficiency
*
1
%
94.1
94.1
94.1
94.1
94.1
94.1
Thermal efficiency
*
1
%
96.1
96.1
96.1
96.1
96.1
96.1
NG Supply Pressure
”w.c. (max.)
14
14
14
14
14
14
”w.c. (min.)
4
4
4
4
4
4
LPG Supply Pressure
”w.c. (max.)
”w.c. (min.)
14
10
14
10
14
10
14
10
14
10
14
10
Power Supply
Voltage
120
120
120
120
208
*
2
208
*
2
Phase
1
1
1
1
3
3
Hz
60
60
60
60
60
60
Amp.
20
20
20
20
20
20
Overall Boiler Length
(including insulation
in.
(mm)
90
c
(2305)
90
c
(2305)
101
f
(2581)
101
f
(2581)
138
(3503)
138
(3503)
and jacketing)
Overall Boiler Width
(including insulation
in.
(mm)
33
(860)
33
(860)
39
e
(1000)
39
e
(1000)
39
e
(1000)
39
e
(1000)
and jacketing)
Overall Boiler Height
*
4
(including insulation
and jacketing)
in.
(mm)
78
c
(2000)
78
c
(2000)
84
(2131)
84
(2131)
84
(2131)
84
(2131)
Concrete boiler base
*
3
Length
in.
(mm)
74
(1900)
74
(1900)
82
f
(2100)
82
f
(2100)
114
d
(2900)
114
d
(2900)
Width
in.
(mm)
33
(860)
33
(860)
39
e
(1000)
39
e
(1000)
39
e
(1000)
39
e
(1000)
Thickness
in.
(mm)
4
(100)
4
(100)
4
(100)
4
(100)
4
(100)
4
(100)
Weight
Complete with the burners,
control, thermal insulation
and jacketing
lb.
(Kg)
4388
(1990)
4388
(1990)
4982
(2260)
5093
(2310)
6592
(2990)
7187
(3260)
*
1
Tested to ANSI/AHRI standard 1500 Performance Rating of Commercial Space Heating Boilers / DOE Test
Procedure 81 FR 89276 / U.S. Standards ANSI Z21.13/CSA 4.9 / AHRI, BTS-2000 Testing Standard Method to
determine the efficiency of Commercial Heating Boilers.
*
2
Requires 208Y/120VAC - 3
phase
- 60 Hz - 4 wire (L1, L2, L3, N, G) power supply.
*
3
Concrete boiler pad is required for all installations (refer to page 10 for additional information).
*
4
Does not include the concrete boiler pad or seismic brackets.
Note:
For altitude operation up to 4,999 feet, derate the input capacity by 3%/1000 ft.
For operation from 5,000 to 10,000 feet, with the electronic altitude adjustment made,
derate the input capacity by an additional 0.6%/1000 ft. for a total derate of 18%.
A
A
Input capacity after electronic altitude adjustment is made.