4
5790 733 - 07
Vitocrossal 300 CA3 - 3.5, 4.0, 5.0 and 6.0 Installation/Service
Table of Contents
Safety
General Information
Installation
System Layout
Venting
Page
Safety, Installation and Warranty Requirements ............
2
Important Regulatory and Installation Requirements ........
8
About these Installation Instructions ...........................
10
Product Information ..................................................
10
Mechanical Room .....................................................
11
For Retrofit Applications ............................................
11
Recommended Minimum Service Clearance .................
12
Unpacking and Placement of Boiler .............................
13
Reducing Boiler Height ...........................................
13
Preparing the Boiler ..................................................
14
Water Side Connection ...........................................
14
Boiler Connections ....................................................
15
Electrical Connections............................................
18
Activating the Boiler Section Valves .........................
35
Extension EA1 Accessory (optional) .........................
36
Making the LON Connection ......................................
37
Vitocom 100, LAN 1 ................................................
38
Vitocom 100, LAN 1 Requirements ............................
39
Operation with Vitotrol App ....................................
40
Operation with Vitotrol 100 User Interface ..................
41
Checking Network Settings .....................................
41
Vitocom 100, LAN 1 Internal Overview .......................
42
Connecting to the Network (LAN) ...............................
42
Vitocom 100, LAN 1 Display and Control Elements .....
43
Switching on the Vitocom 100, LAN 1 ........................
43
Configuring Network Using Static IP ...........................
44
Registering the Vitocom 100, LAN 1 ........................
45
Function Test ..........................................................
45
Enabling Maintenance ............................................
46
Return Vitocom 100, LAN 1 to Factory Set Condition ..
46
Troubleshooting Measures for Vitocom 100, LAN 1 ......
47
Connecting Flue Gas Pipe ..........................................
48
Connecting Neutralization System ..............................
49
Condensate Connection ............................................
50
Gas Connections ......................................................
51
Initial System Fill ...................................................
54
General ...................................................................
55
System Layout 1 ..................................................
56
System Layout 2 ..................................................
57
Boiler Piping in Heating/Cooling Application .................
58
General Venting Information ......................................
59
Connecting Combustion Air Intake for Direct Vent ........
62
Additional Requirements for Stainless Steel
Vent Pipe Material ....................................................
62
Requirement for UL/ULC Listed Rigid SS/PP(s)
Vent Pipe Material ....................................................
63
Vent Requirements ................................................
64
Direct Venting (Two Pipe System) ..............................
65
Side Wall Venting .................................................
66
Component Installation Guide ..................................
66
Elbow - Equivalent Length ......................................
66
Vent Termination Location Requirements - Vertical .......
67
Installation of Support System - PP(s) .........................
67