Vertiv
|
NetSure 710 Series Installation Manual (IM581127000)
|
Rev. U
140
Final Steps
Procedure
1.
If any controller configuration settings were changed, refer to the ACU+ Instructions (UM1M820BNA) or
NCU Instructions (UM1M830BNA) and save a copy of the configuration file. This file can be used to
restore the controller settings, if required, at a later date.
•
Note that provided on a USB drive furnished with the system is a controller configuration drawing
(C-drawing) and the controller configuration files loaded into the controller as shipped.
2.
Close the distribution cabinet’s front door. Turn the latch clockwise to secure the door.
3.
Verify all rectifier and converter modules and the controller are fully seated, latched, and the latch
handle screws secured.
4.
Verify there are no external alarms and the local indicators are as shown in