Vertiv
|
NetSure 710 Series Installation Manual (IM581127000)
|
Rev. U
14
Securing the Relay Rack to the Floor
All equipment cabinets are factory mounted to the relay rack(s) or shipping brackets specified when ordered.
Secure the relay rack to the floor per site requirements. Refer to “General Requirements” on page 13.
Ventilation Requirements
Refer to the “General Requirements” on page 13.
Relay Rack Floor Mounting Dimensions
for relay rack floor mounting dimensions.