Hardware installation
procedures
This chapter includes the following topics:
■
■
■
Installing disk drives into a full-capacity storage shelf
■
Installing disk drives and blanks into a half-capacity storage shelf
■
Installing the compute node rack rails
■
Installing the compute node into a rack
■
Connecting the hardware to one compute node
■
Connecting the hardware to two compute nodes
■
Connecting NetBackup nodes to the network
■
Connecting Flex nodes to the network
■
■
Turning on the hardware and verifying operation
■
Configuring the IPMI port from the NetBackup Appliance Shell Menu
■
Configuring the Veritas Remote Management Interface from a Flex Appliance
■
Accessing and using the Veritas Remote Management interface
3
Chapter