■
Connect the end of the cable to port A in the right I/O module in the third
Expansion Shelf.
■
Connect one end of a new SAS-3 cable to port C on the left I/O module of
the existing shelf.
■
Connect the other end of the cable to port A on the left I/O module on the
second shelf.
■
Connect one end of a new SAS-3 cable to port A on the right I/O module
of the existing shelf.
■
Connect the other end of the cable to port C on the right I/O module on the
second shelf.
■
Connect one end of a new SAS-3 cable to port C on the left I/O module of
the second shelf.
■
Connect the other end of the cable to port A on the left I/O module on the
third shelf.
■
Connect one end of a new SAS-3 cable to port A on the right I/O module
of the second shelf.
■
Connect the other end of the cable to port C on the right I/O module on the
third shelf.
109
Adding Expansion Storage Shelves to an operating appliance that has at least one operating Expansion shelf
Connecting two Expansion Shelves to a system that has one existing Expansion Shelf