■
Connect the left cable to port A in the left I/O module on the closest
Expansion Shelf.
■
Connect the right cable from the Primary Shelf to port A in the right I/O
module in the farthest Expansion Shelf.
■
Connect one end of a new cable to port C in the left module of the first
Expansion Shelf.
■
Connect the other end of the cable to port A in the left module of the second
Expansion Shelf.
■
Connect one end of the final cable to port A on the right I/O module of the
first Expansion Shelf.
■
Connect the other end of that cable to port C in the right I/O module of the
second Expansion Shelf.
96
Adding Expansion Storage Shelves to an operating appliance that does not have any Expansion shelves
Connecting two Expansion Shelves to the Primary Shelf