
5
Verify that the Power on (standby) LED on the front, left, of the shelf is green.
6
Turn on the Primary Storage Shelf.
■
Let the shelf initialize for 2 or 3 minutes.
■
Verify that the Power OK LEDs on the power supply modules are green.
■
Verify that the Power On LED on the control panel on the front of the shelf
is green.
80
Hardware installation procedures
Turning on the hardware and verifying operation