
Adding Expansion Storage
Shelves to an operating
appliance that has at least
one operating Expansion
shelf
This appendix includes the following topics:
■
■
Turning off the existing hardware
■
■
Connecting one Expansion Shelf to a system that has one existing Expansion
Shelf
■
Connecting two Expansion Shelves to a system that has one existing Expansion
Shelf
■
Connecting one Expansion Shelf to a system that has two existing Expansion
Shelves
Overview
This appendix applies to an operating appliance that has one or two compute nodes
and a Primary Storage Shelf.
B
Appendix