■
Connect slot 7, Port 1 of the compute node to controller A, Port 0 on the
Primary Shelf.
Use the following procedure to connect Expansion Storage Shelves to the Primary
Shelf.
If you do not have any Expansion shelves at this time, proceed to the following
section to connect power cords to the hardware.
See
on page 74.
To connect Expansion Storage Shelves to a Primary Shelf
1
Do the following if you have one Expansion Shelf.
■
Connect one end of two SAS-3 cables to the SAS-3 port on the left hand
side of each RAID controller in the Primary Shelf.
The blue tab on the cable
must
face down in this port.
59
Hardware installation procedures
Connecting the hardware to one compute node