7
Connect two power cords between the compute node and the PDU.
8
Verify that the final power cord cabling is consistent with the following diagram.
Turning on the hardware and verifying operation
You must turn on the hardware in the following order:
■
Expansion shelf
■
Primary shelf
77
Hardware installation procedures
Turning on the hardware and verifying operation