4  TECHNICAL DATA 

 

4.1  NOMINAL FLOWRATES IN SERVICE 

 

Nominal flows are based on operation at 15

C, 500mg/l TDS, 20mg/l CO2 and SDI <3 

Actual flow rates are site specific and will be defined in the Design Qualification for the plant, 
but in general will depend on 

– 

 

  Operating temperature 

  Feed water analysis 

  Size of unit 

  Required product water specification 

  System recovery 

 
 

4.1.1  Single Pass RO only 

 

MODEL 

 

500 

1000 

2000 

4000 

6000 

8000 

10000 

Feed 

I/h 

667 

1333 

2667 

5333 

8000 

10667  13333 

Product 

l/h 

500 

1000 

2000 

4000 

6000 

8000 

10000 

RO Concentrate to Drain 

I/h 

167 

333 

667 

1333 

2000 

2667 

3333 

RO Concentrate Recycle  

I/h 

1180 

530 

860 

4250 

3520 

4000 

5260 

Recovery 

75 

 

4.1.2  Twin Pass RO only 

 

MODEL 

 

500 

1000 

2000 

4000 

6000 

8000 

10000 

Feed 

I/h 

990 

1780 

3210 

6350 

8940 

11920  14530 

Product 

l/h 

500 

1000 

2000 

4000 

6000 

8000 

10000 

RO Concentrate to Drain 

I/h 

490 

780 

1210 

2350 

2940 

3920 

4530 

Pass 1 RO Conc Recycle  

I/h 

900 

900 

200 

4600 

4800 

1800 

1200 

Pass 2 RO Conc Recycle  

I/h 

890 

1170 

1270 

4700 

4700 

6270 

6350 

Recovery 

50 

– 70 

 

 
 
 

Summary of Contents for Orion II 2000

Page 1: ...OPERATORS MANUAL ORION II Orion II 500 10000 Operators Page 1 of 95 Manual Part no DOMAON0100 Issue A April 2008 ORION II Operators Manual Models 500 10000...

Page 2: ...2 12 COMMUNICATIONS 13 3 2 13 WINFLEXCC DATA LOGGING 13 3 2 14 STAINLESS STEEL 13 3 2 15 ELECTRICAL CONTROLS 13 3 3 IMPORTANT INFORMATION 14 4 TECHNICAL DATA 15 4 1 NOMINAL FLOWRATES IN SERVICE 15 4...

Page 3: ...ITOR 27 5 3 3 OPTION 27 PH CONTROLLER 27 5 4 PURIFIED WATER SYSTEM RO SECTION 28 5 4 1 RO FEED TANK TK30 01 28 5 4 2 RO FEED PUMP PU1 28 5 4 3 OPTION 40 SINGLE PASS REVERSE OSMOSIS 29 5 4 4 OPTION 42...

Page 4: ...ATIOM 66 6 6 1 ALARMS 67 6 7 PROCESS STATUS TEXT 68 6 7 1 GENERAL 68 6 7 2 OPTION 10 SOFTENERS 69 6 7 3 OPTION 11 SOFTENERS TTS 70 6 8 ALARMS 71 6 8 1 FATAL 71 6 8 2 WARNINGS 72 6 8 3 ADDITIONAL OPTIO...

Page 5: ...0 10000 Operators Page 5 of 95 Manual Part no DOMAON0100 Issue A April 2008 9 3 CALCULATING CEDI CURRENT 92 9 3 1 CURRENT CALCULATION 92 9 4 OPERATING LOG SHEETS 93 9 4 1 DAILY LOG SHEET 93 9 4 2 WEEK...

Page 6: ...1 45 11 55 55 Fax 33 0 1 45 11 55 00 www veoliawaterst com ORION II Models 500 10000 Conform to the following EC Directives where required The Electromagnetic Compatibility Directive 2004 108 EC incl...

Page 7: ...hed and the correct rated fuses should be fitted Power should be switched off at a remote isolator before commencing work on the equipment 2 3 EMERGENCY SHUTDOWN In an emergency the unit can be turned...

Page 8: ...e gas outlet from the separator vented outside the building If a gas separator is not supplied the unit should be installed in a room provided with adequate ventilation see below 2 7 VENTILATION The u...

Page 9: ...accordance with the instructions in this manual If there are any enquiries regarding the installation operation or servicing of the ORION unit contact Veolia Water Service Department 3 2 SYSTEM OVERVI...

Page 10: ...articulate matter 11 Standard Softeners Hot Water Sanitisable SOF11 01 SOF11 02 Hot Water Sanitisable Base Exchange Softeners to prevent scaling of the RO membranes Used where the feed water contains...

Page 11: ...control signal to the Sodium Hydroxide dosing set This reduces the amount of Carbon Dioxide and thereby ionic load in the feed to downstream deionisation equipment 3 2 4 Purified Water System RO Sect...

Page 12: ...1 Diverter valve to divert water to the product water tank when required and recycle to TK30 01 when not The valve should be fitted as close as possible to the product water tank to minimise product w...

Page 13: ...nd data logging via password system to provide an audit trail for 21 CFR Pt 11 Compliance 3 2 14 Stainless Steel N A Stainless Steel Pipe The various options can be supplied with Dairy or ASME BPE Pip...

Page 14: ...n when necessary Corrected flux salt passage and CEDI performance is monitored on a regular basis and any abnormal trends acted upon when necessary If the required product water quality is not being a...

Page 15: ...System recovery 4 1 1 Single Pass RO only MODEL 500 1000 2000 4000 6000 8000 10000 Feed I h 667 1333 2667 5333 8000 10667 13333 Product l h 500 1000 2000 4000 6000 8000 10000 RO Concentrate to Drain...

Page 16: ...000 Feed I h 741 1481 2963 5925 8889 11852 14815 Permeate l h 556 1111 2222 4444 6667 8889 11111 RO Concentrate to Drain I h 185 370 741 1481 2222 2963 3704 RO Concentrate Recycle I h 1180 530 860 425...

Page 17: ...0 4000 6000 8000 10000 Recovery 67 4 2 NOMINAL FLOWRATES PRODUCT WATER IN RECYCLE 4 2 1 Single Pass RO only MODEL 500 1000 2000 4000 6000 8000 10000 Feed I h 60 120 240 480 720 960 1200 Product in Rec...

Page 18: ...trate Recycled l h 56 111 222 444 667 889 1111 Product in recycle I h 500 1000 2000 4000 6000 8000 10000 Recovery Not Applicable 4 2 4 RO CEDI UF CEDI Concentrate always Recycled when Product in Recyc...

Page 19: ...00 3000 4 3 2 Twin Pass RO MODEL 500 1000 2000 4000 6000 8000 10000 RO Conc Recycle 45o C P1 I h 1000 1000 1000 2000 2000 3000 3000 RO Conc Recycle 45o C P1 I h 800 800 800 1600 1600 2400 2400 RO Conc...

Page 20: ...nics colloids and suspended solids SDI 3 Feed water pressure 4 5 bar optimum 6 bar maximum Total hardness 500 ppm as CaCO3 10 ppm as CaCO3 feed to the RO 1 ppm as CaCO3 feed to the CEDI modules Free c...

Page 21: ...according to Design Qualification Full Load Current also see Design Qualification 4 7 2 Compressed air Instrument grade 6 9bar 1Nm3 h 4 7 3 Degasser Sweep Gas Nm3 h 500 1000 2000 4000 6000 8000 10000...

Page 22: ...ardness 300mg l 1 Total Hardness 300mg l 2 4 9 SALT SPECIFICATION Property Specification NaCl 99 9 Insoluble matter 100ppm Alkalinity as Na2CO3 150ppm Sulphate as Na2SO4 600ppm Calcium 50ppm Magnesium...

Page 23: ...any further hardness from the feed water It then requires regeneration by passing a concentrated common salt Sodium Chloride solution through it to displace the hardness ions with Sodium ions before i...

Page 24: ...that CarboSoft provides an excellent degree of protection from oxidative damage to the RO and CEDI modules should an unexpected quantity of chlorine appear in the feed water RO and CEDI modules on uni...

Page 25: ...have been exchanged the resin is exhausted and cannot remove any further hardness from the feed water It then requires regeneration by passing a concentrated common salt Sodium Chloride solution throu...

Page 26: ...ed quantity of chlorine appear in the feed water RO and CEDI modules on units supplied without CarboSoft softeners will not carry warranty against oxidative damage 5 1 6 Cartridge Filtration 5 m cartr...

Page 27: ...etabisulphite to remove Chlorine from the feed water As the pump is controlled Proportional to Flow it can only be used with option 10 or 11 5 2 2 Option 21 pH Control This option consists of a Dosing...

Page 28: ...emptied during cleaning and other operating cycles A purified water return connection to allow purified water to be recycled during periods of no usage An opening in the top of the tank normally seale...

Page 29: ...final RO module passes a pressure sensor PT40 01 and is then split into two streams one is directed to drain and the other recirculated to TK30 01 The flow volumes are measured by FT40 01 and FT40 02...

Page 30: ...asses through the shell side of the module and oil free filtered air instrument grade is passed down through the centre of the hollow fibres to strip carbon dioxide gas from the water Permeate from th...

Page 31: ...er consult Veolia Water for assistance 5 5 3 Option 61 Gas Separator An optional gas separator GS61 01 can be fitted in the CEDI concentrate stream to separate the gases produced at the CEDI electrode...

Page 32: ...rofiltration An optional post treatment Microfilter F72 01 stage can be specified for Orion units where additional bacteria control is required A sanitary sample valve V72 01 on the inlet of the unit...

Page 33: ...ter deadleg 5 8 3 Option 92 Outlet Three 2 Way Valves VA92 01 VA92 02 VA92 03 are three 2 Way valves to divert water to two product water tanks when required and recycle to TK30 01 when not The valves...

Page 34: ...sensors reaches 45 C the pump pressure is further reduced to 2 2bar to prevent compaction damage to the RO membranes When the system temperature as recorded by all three sensors exceeds 80 C a hold ti...

Page 35: ...n which is displayed after every power cycle The System Menu screen is split into a number of sections namely Screens System Cleaning Routines System Configuration Commissioning Diagnostics Command Bu...

Page 36: ...Items which have 2 digital inputs and 1 digital output e g 3 way outlet valve and optional 2 way valves are animated according to the following table Output Input Open Input Close Description 0 0 1 Gr...

Page 37: ...presented a valid I Button onto the I Button reader located to the right of the HMI on the outside of the panel Four types of I Buttons are used namely Operator green key ring Supervisor red key ring...

Page 38: ...ow the system has been configured the Softeners and CDI Stage buttons on the System Menu may have been disabled and hence these screens will not be accessible All graphical screens follow a common lay...

Page 39: ...be accessed directly by means of the shortcut buttons Softener 1 Softener 2 Pump RO Stage CDI Stage Outlet This is a common feature available on all graphical screens Depending on how the system has b...

Page 40: ...the system has been configured for a twin pass RO then the Overview screen will show the additional equipment associated with a twin pass RO as seen below The RO stage button has been replaced by sta...

Page 41: ...Orion II 500 10000 Operators Page 41 of 95 Manual Part no DOMAON0100 Issue A April 2008 Depending on the system configuration the Softeners and CDI stage may be disabled and hence the overview screen...

Page 42: ...DOMAON0100 Issue A April 2008 6 2 2 SOFTENERS The Softener screen is an overview of the Softener stage as shown below configured with one brine tank The status of each softener is clearly shown above...

Page 43: ...If being controlled by a pressure then the target flow box is removed and a target pressure box is seen above the pressure bar readout Via the Pump Control Centre panel the pump may be put into manua...

Page 44: ...f required The Salt Rejection and Corrected Flux values are animated The corrected flux trend may be accessed by means of pressing the graph symbol next to the animated value NOTE the Corrected Flux v...

Page 45: ...OPERATORS MANUAL ORION II Orion II 500 10000 Operators Page 45 of 95 Manual Part no DOMAON0100 Issue A April 2008 If the system has been setup as a Twin Pass the RO screen will take the following form...

Page 46: ...o the unit The Voltage and Current applied to the CDI stage can be monitored Also the control on off signal applied to the stacks power card can be enabled disabled via the enable disable buttons Duri...

Page 47: ...100 Issue A April 2008 For a unit fitted with a UF as seen below the permeate is set higher to take into account the extra loss of the UF recycle after the CDI stage e g for a 2000 unit the Permeate w...

Page 48: ...en below The Start HWS button allows the operator to manually start a HWS cycle providing the system is not in service The last time a HWS was started manually is recorded together will an incrementin...

Page 49: ...f the outlet stage Depending on how the system has been configured this will either show 1 x 3 way valve 2 x 2 way valves or 3 x 2 way valves The screen below is an example of when the system is confi...

Page 50: ...OPERATORS MANUAL ORION II Orion II 500 10000 Operators Page 50 of 95 Manual Part no DOMAON0100 Issue A April 2008 If 2 x 2 ways vales are fitted the outlet screen will take the following form...

Page 51: ...OPERATORS MANUAL ORION II Orion II 500 10000 Operators Page 51 of 95 Manual Part no DOMAON0100 Issue A April 2008 If 3 x 2 ways vales are fitted the outlet screen will take the following form...

Page 52: ...rogrammed with 3 cleaning routines namely RO Clean RO Sanitise CDI Clean These cleaning routine are only available if they are enabled from the System Configuration Options screen 6 3 1 RO CLEAN From...

Page 53: ...ors Page 53 of 95 Manual Part no DOMAON0100 Issue A April 2008 6 3 2 RO SANITISE From this screen the RO Sanitise sequence can be started providing the system status is not in service Follow the Opera...

Page 54: ...ators Page 54 of 95 Manual Part no DOMAON0100 Issue A April 2008 6 3 3 CDI CLEAN From this screen the CDI Clean sequence can be started providing the system status is not in service Follow the Operato...

Page 55: ...mely Service HWS CIP Other Analogue Options Users 6 4 1 SERVICE The service screen is where all settings associated with the in service operation are maintained as seen below Depending on the system c...

Page 56: ...ON II Orion II 500 10000 Operators Page 56 of 95 Manual Part no DOMAON0100 Issue A April 2008 PID VA40 Settings 6 4 2 HWS The HWS screen is where all settings associated with the HWS sequence are main...

Page 57: ...NUAL ORION II Orion II 500 10000 Operators Page 57 of 95 Manual Part no DOMAON0100 Issue A April 2008 6 4 3 CIP The CIP screen is where all settings associated with the CIP sequences are maintained as...

Page 58: ...nual Part no DOMAON0100 Issue A April 2008 6 4 4 OTHER The Other screen is where all other setting and maintained as seen below The time data can only be adjusted with Administrator access level Howev...

Page 59: ...of 95 Manual Part no DOMAON0100 Issue A April 2008 If the printer is set to Connected then an additional printer icon is seen at the top of every screen next to the model size as seen below This allow...

Page 60: ...ALOGUE The Analogue screen is where all the 20mA setting for each channel are set as seen below These are set setup as parts of the modes size and should not every need to be adjusted The analogue Raw...

Page 61: ...of 95 Manual Part no DOMAON0100 Issue A April 2008 6 4 6 OPTIONS The Options screen is where the main system configuration is performed as seen below These setting can only be modified with Engineer...

Page 62: ...Operators Page 62 of 95 Manual Part no DOMAON0100 Issue A April 2008 6 4 7 USERS The Users screen is where users and their associated passwords are maintained as seen below This screen is only provide...

Page 63: ...eens which are needed but not on a regular basis namely Force IO Control Panel Clean Screen Terminate Application Training Mode Event Log 6 5 1 FORCE I O The Force IO screen allows you to monitor digi...

Page 64: ...ATION APPLICATION The terminate application button terminates the graphical interface program and returns to the windows desktop Engineer access level is required to perform this function 6 5 5 TRAINI...

Page 65: ...nual Part no DOMAON0100 Issue A April 2008 6 5 6 EVENT LOG The Event Log is a historical log of system events as seen below This event log is stored in volatile memory so is lost when the power is rem...

Page 66: ...on the CIP screens While the unit is running the Product Flow and units Recovery are calculated and displayed The product flow is calculated as follows Permeate Flow CDI Concentrate Inlet flow systems...

Page 67: ...alarms as seen below New alarms just raised have status C for current Operate the Alarm Reset button If the alarm condition has gone away the status will change to D for de activated De activated ala...

Page 68: ...Service Feeding The Process 9 In Service Divert to Recirculating 10 In Service Shutdown 11 In Service Standby 101 HWS Start 102 HWS Open Tank Inlet 103 HWS Waiting for Low Level 104 HWS Heat Stage 1 W...

Page 69: ...307 CIP3 Drain Tank 308 CIP3 Refill Tank 309 CIP3 Rinse 310 CIP3 Rinse Complete 311 CIP3 Disconnect Hose etc 312 CIP3 Shutdown 6 7 2 Option 10 Softeners Step Softener 1 Softener 2 0 In Service In Serv...

Page 70: ...e Draw In Service 6 Brine Draw In Service 7 Move to Fast Rinse In Service 8 Fast Rinse In Service 9 Move to Tank Refill In Service 10 Brine Tank Refill In Service 11 Move to Service In Service 12 In S...

Page 71: ...igh The feed conductivity is above is fatal setting Fatal Tank Low Level The feed tank has gone low more times than is allowed during a 24 hour period Fatal PU30 01 Pump Not Started The pump has been...

Page 72: ...tage if the tank temperate goes above a configuration set point this alarm warning is raised and the pump control becomes cyclic Warning CIP Periodic Pump Control Initiated As above Warning Degasser A...

Page 73: ...The final conductivity reading is above the configurable set point If the unit was feeding the process the feed is diverted to recycle Warning Poor Final Temperature The final temperature reading is a...

Page 74: ...CS03 Out of Range See above Warning Analogue Input FT1002 Out of Range See above Warning Analogue Input FT4001 Out of Range See above Warning Analogue Input FT4002 Out of Range See above Warning Anal...

Page 75: ...not come on Warning Softener 1 Service Position Lost While the softeners is in service the service position has been lost Warning Softener 2 Service Position Lost While the softeners is in service th...

Page 76: ...d Key and above Softeners Stage Advance Supervisor Red Key and above HWS Stage Advance Supervisor Red Key and above Pump Control Supervisor Red Key and above RO Control Supervisor Red Key and above CD...

Page 77: ...Manual Part no DOMAON0100 Issue A April 2008 If an engineer key is used which has expired the following message will be seen I Buttons can be checked for their type and expired date by means of the I...

Page 78: ...stalled and commissioned Switch on compressed air supply to the system and regulate to 6 bar using the regulator inside the right hand side control cabinet Switch on feedwater supply to the unit A min...

Page 79: ...CY SHUTDOWN In an emergency TURN THE UNIT OFF AT THE DOOR INTERLOCK ISOLATOR IMPORTANT IF THE UNIT IS TO BE SHUT DOWN FOR MORE THAN ONE WEEK THEN IT SHOULD BE HOT WATER SANITISED AND ALL THE ISOLATING...

Page 80: ...ilable electronically from Veolia Water and should be tailored to specific customer requirements The content of the log sheets also depends on what optional equipment if any is included Monitoring the...

Page 81: ...s Free Cl2 Iron and SDI V12 09 V13 09 Filter Outlet Used to check Hardness Free Cl2 Iron and SDI V45 01 RO Permeate Bacteria sample point and Endotoxin on UF units V70 01 UV Inlet Bacteria sample poin...

Page 82: ...d 1 Remove Luer cap 2 Open valve and allow full flow out of the valve for 2 minutes 3 Do not touch valve as this can dislodge contaminants from the internal components 4 Open sterile container and pla...

Page 83: ...following chemicals are recommended for use with ORION systems Solution A Acid Cleaning Solution Properly operated RO systems should not require acid cleaning Precipitation can however occur when the...

Page 84: ...sures that any temporary transient low flux values are ignored by the system The calculation will automatically be suspended with the last value being displayed when the unit is not in Service The cal...

Page 85: ...ervisor level security access as these operations will interrupt the supply of product water The procedure is initiated from the RO Clean screen on the HMI All instructions for operation of the CIP se...

Page 86: ...tivity AIC45 01 should have approached normal service values Check TK30 01 contents to ensure that no visible traces of the cleaning solution remain e g foam coloured water The tank drain valve V30 02...

Page 87: ...ermine when the unit has been sufficiently rinsed to be put back into production The Acknowledge Action Performed button can be used to step though timed stages Pressure flow rate and temperature limi...

Page 88: ...f the total input water that is converted to purified water or permeate A recovery of 10 means that only 1 part in ten of the input water is converted to permeate At 50 recovery half of the input wate...

Page 89: ...ds alkalis and gasses particularly carbon dioxide are poorly rejected A rejection rate of 99 means that that only 1 of the impurities will pass through the membrane A 99 rejection membrane would there...

Page 90: ...es between the membranes are configured to create liquid flow compartments with inlets and outlets The compartments bound by the anion membrane facing the anode and the cation membrane facing the cath...

Page 91: ...ions through the cation membranes and captured anions through the anion membranes 4 Cation permeable membranes transport cations such as sodium Na ions out of the diluting compartment but prevent anio...

Page 92: ...ermine the current setting amps follow these steps I Flow FCE K Where I Current amps Flow Product Flow m3 h FCE Feed Conductivity Equivalent Measured Conductivity S cm CO2 ppm x 2 66 K Constant 0 0924...

Page 93: ...e A April 2008 9 4 OPERATING LOG SHEETS Examples of a log sheets are shown overleaf however these will vary according to the options chosen The log sheets are available from Veolia Water in soft copy...

Page 94: ...03 Cartridge Filter Outlet Pressure Bar PI2 PI3 Cartridge Filter Pressure Drop Bar PT30 01 Pump Outlet Pressure Bar PT40 01 RO Concentrate Pressure Bar PI45 01 RO Permeate Pressure Bar PI60 01 CEDI C...

Page 95: ...ivity S cm Feed Water SDI None V10 11 Softened Water Hardness mg l Softened Water Free Chlorine mg l Softened Water SDI None Softened Water Iron mg l 9 4 3 Microbiology ORION MICROBIOLOGY LOG SHEET Si...

Reviews: