OPERATORS MANUAL
ORION II
Orion II 500-10000 Operators
Page 68 of 95
Manual Part no: DOMAON0100 Issue A
April 2008
6.7 PROCESS STATUS TEXT
6.7.1 General
Step
Text
0
Not In Service
1
In Service - Open Tank Inlet
2
In Service - Waiting for Low Level
3
In Service - Start Pump Control
4
In Service - Start RO Control
5
In Service - Start CDI Control
6
In Service
– Recirculating
7
In Service - Divert to Feed
8
In Service - Feeding The Process
9
In Service - Divert to Recirculating
10
In Service - Shutdown
11
In Service - Standby
101
HWS - Start
102
HWS - Open Tank Inlet
103
HWS - Waiting for Low Level
104
HWS - Heat Stage 1- Watchdog
105
HWS - Heat Stage 2
– Watchdog
106
HWS - Hold Stage
107
HWS - Cool Stage 1
– Watchdog
108
HWS - Cool Stage 2
– Watchdog
109
HWS - Shutdown
201
CIP1/2 - Connect Hose
202
CIP1/2 - Tank Filling
203
CIP1/2 - Start up Delay
204
CIP1/2 - Add Chemicals
205
CIP1/2
– Recirculation
206
CIP1/2
– Rinse
207
CIP1/2 - Rinse Complete
208
CIP1/2 - Disconnect Hose etc.
209
CIP1/2 - Shutdown
301
CIP3 - Connect Hose
302
CIP3 - Tank Filling