5-1
Valco Cincinnati, Inc.
SECTION 5 - OPERATION
SECTION 5 - OPERATION
SECTION 5 - OPERATION
SECTION 5 - OPERATION
SECTION 5 - OPERATION
Operation of the VCX System is managed through the OT-120 Control.
The screen may look slightly
different depending on the revision
of software that is installed on the
OT-120.
The power up sequence is as follows:
1.
Press the Power On Button on the bottom left of the OT-120 (see
Figure 5-1).
Power Up
Sequence
2.
Plug in the VCX.
3.
Flip the power switch on the back of the VCX Power Supply
Module to the “On” position (see Figure 5-2).
Figure 5-1. OT-120 Touchscreen
Figure 5-2. VCX Power Supply Module Power Switch
Power
Supply
Module
Slots for Modules
Power
On/Off
Switch
“ON/OFF” Button