44
•
vacon
installation
3
3.2.7 Stripping lengths of motor and mains cables
Figure 3.31: Stripping of cables
Note!
Strip also the plastic cover of the cables for 360 degree earthing. See Figures
3.2.8 Cable installation and the UL standards
To meet the UL (Underwriters Laboratories) regulations, a UL-approved copper ca-
ble with a minimum heat-resistance of +60 / 75 °C must be used.
Use Class 1 wire only.
The units are suitable for use on a circuit capable of delivering not more than 50,000
rms symmetrical amperes, 600V maximum, when protected by T and J Class fuses.
For MI4 without DC-choke, maximum short circuit current has to be not more than
2.3 kA, for MI5 without DC-choke, maximum short circuit current has to be not more
than 3.8 kA.
Integral solid state short circuit protection does not provide branch circuit protec-
tion. Branch circuit protection must be provided in accordance with the National
Electric Code and any additional local codes. Branch circuit protection provided by
fuses only.
Motor overload protection provided at 110% of full load current.
3.2.9 Cable and motor insulation checks
These checks can be performed as follows if motor or cable insulations are suspect-
ed to be faulty.
1. Motor cable insulation checks
Disconnect the motor cable from terminals U / T1, V / T2 and W / T3 of the frequency
converter and from the motor. Measure the insulation resistance of the motor cable
20 mm
35 mm
8 mm
Earth conductor
8 mm
Summary of Contents for 20
Page 1: ...vacon 20 ac drives complete user manual ...
Page 2: ......
Page 6: ...1 ...
Page 12: ...6 vacon safety 1 ...
Page 27: ...installation vacon 21 3 ...
Page 28: ...22 vacon installation 3 MI1 MI5 3P 230 V POWER LOSS ...
Page 29: ...installation vacon 23 3 ...
Page 30: ...24 vacon installation 3 ...
Page 31: ...installation vacon 25 3 MI1 MI3 1P 230 V POWER LOSS ...
Page 32: ...26 vacon installation 3 ...
Page 40: ...34 vacon installation 3 Figure 3 23 Open the lid MI1 MI3 Figure 3 24 Open the lid MI4 MI5 ...
Page 43: ...installation vacon 37 3 4 5 6 ...
Page 52: ...46 vacon installation 3 ...
Page 76: ...70 vacon control panel 7 ...
Page 104: ...98 vacon parameters 8 ...
Page 152: ...146 vacon parameter descriptions 9 ...
Page 158: ...152 vacon technical data 10 ...
Page 159: ......
Page 160: ...Rev E2 Document ID ...