Page 28
PLACING IN SERVICE
YES
NO
Is the compressor disconnect switch ON, and is the unit lockable shutoff valve OPEN?
Have the valves on the Auxiliary Condensate Drain Device been left properly positioned per the
nameplate instructions?
Is the battery properly connected to the control unit?
Is the control unit AC POWER indicator ON, and are all other indicators OFF?
Is the pressure gauge needle indicating between 13 and 18 PSIG?
Has the customer’s lock been placed on the unit lockable shutoff valve?
Is the control unit door locked?
Have the control unit keys, lockable shutoff valve key(s), and UFS Manual P/N 10-540101-001 been
given to the responsible individual at the job site?
If the control unit dialer is connected to telephone lines, has the party receiving signals been notified that
testing is complete and system is in service?
Have all required on-site parties been notified that testing is complete, system is now in service, and all
subsequent signals are NOT test signals?
FINAL ACCEPTANCE SIGNATURES
PRINT NAME
SIGNATURE
DATE
CUSTOMER
INSTALLING
CONTRACTOR
NOTES
COMMISSIONING WORKSHEET AND CHECKLIST
STANDPIPE-PAC
™ SUPERVISORY SYSTEM
UFS-238B REVISION 1.00
– PAGE 3 OF 3