4
Take the glazing bars from the roof pack and check the anchor
clips are fitted (the clips are always at the top of the slope). On the
eaves beam check that there are the correct amount of twin and
single bolts and that the glazing support trim is fitted.
Attach the glazing bar end cap fixing blocks - as access restrictions
(box gutter situations) may prevent easy attachment later. NOTE:
These are attached to the end caps when despatched from the
factory.
Check the condition of the host wall as this may affect the quality of the final installation. Check the host wall is plumb - any running in/
or out should have been accounted for by the surveyor. If not, the ridge and starter bars may require packing out with aluminium shims.
Correct alignment in this area is critical to a successful installation - Plumb frames/level ridge.
Only use the specified fixings - never be tempted to substitute alternative sizes/gauges.
At this stage do not fix the frames down - pin only to the house
wall (one fix per side) to allow the conservatory to ‘float’.
Unpack the roof vent sash and assemble, see section 2 page 5.
If possible, do this in the factory the day before.
Use the correct sealant
MS Polymer
Low modulus
neutral cure
- Polycarbonate glazing
- Standard sealed units
- Conservaglass
- Self cleaning glass
PRE INSTALLATION CHECKS
SECTION 1