VALLEY INSTALLATION
SECTION 9
Cut and re-fit the glazing support trim,
where the valley meets the eaves beam.
5
Now run a continuous bead of suitable
silicone down the entire length of the
aluminium valley profile, at the point of the
hinged connector in the centre.
6
Using the location plan provided, assemble
the various glazing bars onto the valley. Use
the washers and nuts provided to ensure a
robust joint is created.
7
Fit the double sided sealing tape to each
of the valley wings. Tease one end of the
protective tape loose, crease it about
50mm in from the end and fold over ready
to extract once the glazing panels are laid
in position.
8
To retain the glazing to the valley wing, fit
2 wire clips (100mm from each end of the
profile). The ‘hooked ears’ locate behind
the lip detail as shown. Apply a continuous
bead of sealant (MS Polymer to self cleaning
glass). See Step 37 on page 16.
9
Place the glazing in its correct position (refer
to location plan if in doubt). Position the end
profile down into the valley as shown. With
the glazing pressed flat against the valley
profile and your fingers underneath, pull
the glazing up into the rain baffle and allow
the clip to ‘lock’ the glazing in place. Once
properly fitted, the clip should lock into
place as shown.
10
Fit the valley end cap using the two plastic
rivets supplied.
12
The joint between the full and half ridge pvc
top caps is sealed by the use of a capping
connector. This needs to be trimmed to
suit. Bed the capping on suitable silicone
and fix using the plastic rivets provided.
13
Fit the valley top cladding by folding to form
an internal ‘V - then tap into the aluminium
valley profile using a plastic hammer.
11
Summary of Contents for Classic roof