44
Now attach the Inter-Rafter
weathering hood (may require
trimming in certain situations).
3
Lift the ‘flap’ on leading edge of
the weathering hood, slide the
sealed unit underneath and push
flap back into position.
Using the main installation guide,
build the roof as normal. Attach
the bars to hub end as normal
(steps 11-13 installation guide
p9). Insert the Inter-Rafter into
its position between the 2 pre-
prepared bars and drop the ‘eye’
over the threaded post.
1
Bolt down using the nuts
provided - ensure glazing
platforms are level.
2
Inter-Rafter
Inter-Rafter
INTER RAFTER
SECTION 21
FITTERS TIP - Radius end top
cap
- Plan for access
- Leave a panel out to enable
access for fitting the top
cap.
- Temporarily pack the
glazing bar top caps as
required where panel has
been removed
L SHAPE RIDGES -
HALF RIDGE TO HALF RIDGE
Take the 2 pieces of half ridge and offer
into final position. Support using adjustable
support prop, taking account of all H&S
issues. Check levels. One half ridge already
has the radius assembly attached.
1
2
3
Now build the remainder of the roof in sequence. Then,
as in step 52, p16, seal around each glazing bar top cap
where it meets the inner wall of the ‘soft touch’ weather
-
ing shield. Trial fit the half ridge external radius end top
cap into position. Mark and drill for final rivet positions
using a 5mm drill bit. Trim to fit (see page 40). When sat
-
isfied with fit, apply a bead of appropriate sealant across
each end of the half ridge top cap. Place the radius end
cover over the weathering shield and rivet into position.
4
Trial fit the internal radius end cover
into position. Minor trimming to
ensure a snug fit may be required.
Offer into position and secure using
the threaded plastic rose.
5
On the top shelf of the half ridge, fix the
bracket using one M6 x 25mm taptite
(pozidrive) screw.
On the underside of the half ridge, fasten
the bracket using 2 M5 x 12mm taptite
screws. Check the L shaped half ridge is
finally level and attach to the host wall using
masonry anchors appropriate to substrate.
SECTION 22
Flap
Sealed
Unit
4
Summary of Contents for Classic roof
Page 1: ...V18 January 2021 CLASSIC ROOF INSTALLATION GUIDE...
Page 52: ......