48
CONSERVAFLASH
Ensure the pre-formed soaker is clipped
into the starter bar. At this stage it is easiest
to mark and cut out for the lead flashing.
For best results always grind a 35mm deep
slot to allow Conservaflash to be let into the
wall. Brush out any dust from the channel.
Trial fit the stepped flashing. Start installing
from the gutter towards the ridge. Apply
sealant (clear or grey low modulus neutral
cure) along the two internal weather bar
grooves.
The unique integral mechanical retention
wedge clips bite into the brickwork ensuring
positive location. Insert the next stepped
flashing (using sealant on the back),
ensuring it overlaps to marked minimum.
Continue up the roof, both slopes, with
stepped flashings.
Offer up the horizontal flashing which
should typically sit two courses above the
stepped flashing. Trim to suit the roof pitch.
Use appropriate sealant, MS polymer if self
cleaning glass. Always seal the surface of
lead flashing to prevent run off onto self
cleaning glass.
Place Conservaflash into the ground out
mortar joint at the gutter end, ensuring
lower edge locates into the ‘J’ soaker.
Having added last stepped flashings each
side of the ridge ‘Butter’ the reverse side
of the saddle trim and place over the ridge
body.
1
2
3
4
5
6
Pre-formed soaker
Stepped flashings (L & R)
Saddle apron
Horizontal flashing
To be used on duo-pitch roofs
To be used on lean-to & Ultralite & above
the saddle apron on duo-pitch roofs
To be used on duo-pitch roofs
To be used on duo-pitch roofs
SECTION 23