![UIC GSM FlexJet Manual Download Page 86](http://html1.mh-extra.com/html/uic/gsm-flexjet/gsm-flexjet_manual_3277471086.webp)
Page 81
FlexJet Head Assembly
T47541109 Rev. J
TECHNICAL
PUBLICATIONS
This Document Supports Assembly 47541109 Rev. F
Final Steps
1.
Apply Loctite 222 to the 2 screws and install the Plate and Baffle
(flexible strip) on the bottom of the head. Torque the screws to 80
inch-ounces (0,56 NM).
2.
Install the FlexJet Head on the machine. Refer to the Installing a
FlexJet Head procedure located in this document.
3.
Complete the steps in the Prepare the Machine for Production section
of this document to ensure that the machine is in a safe operational
state. Verify that all covers removed for maintenance are installed,
including the safety covers below the hinged covers.
Replacing a Spindle Touch-Down Sensor
This section describes how to replace a Spindle Touch-Down Sensor due to
damage or wear. Replace the Spindle Touch-Down Sensor using the
following procedure.
The digital Z Safe Sensor has a different part number than the 7 Touch-
Down Sensors. If the Z Safe Sensor is replaced, make sure to complete
the
Adjusting the Z Safe Sensor procedure in this module.
Prerequisites
Ensure that the following items are available before beginning the procedure.
´ New Touch-Down Sensor
• The Impact Sensor Setup Tool from the FlexJet Tool Kit
• Calibration Kit for FlexJet (for spindle height calibration)
• CPE Kit for FlexJet and the Calibration, CPE and Measurement
manual (for spindle height calibration).
Initial Steps
Complete the steps in the Prepare the Machine for Maintenance section of
this document to ensure that the machine is in a safe state for maintenance.
Make sure to remove the FlexJet Head Cover.
The machine must be powered down and the site's Lockout/Tagout
procedure executed during this procedure to ensure personal safety.