![UIC GSM FlexJet Manual Download Page 81](http://html1.mh-extra.com/html/uic/gsm-flexjet/gsm-flexjet_manual_3277471081.webp)
Page 76
T47541109 Rev. J
FlexJet Head Assembly
TECHNICAL
PUBLICATIONS
This Document Supports Assembly 47541109 Rev. F
Advanced Support Information
The following corrective maintenance procedures are intended for
Universal Instruments Corporation Field Service Engineers only.
Unauthorized implementation of these procedures may result in damage
to the machine and may adversely affect your warranty status if
performed by other than UIC personnel.
The advanced support information procedures are those identified on the
maintenance concept table as requiring a minimum skill level of Universal
Instruments Field Service Engineer.
Replacing the Stop Brake Belt
Use the following procedure to replace the Stop Brake Belt.
Prerequisites
Ensure that the following items are available before beginning the procedure.
• New Z Stop Brake Belt
• Torque wrench and Loctite 222
• CPE Kit for FlexJet
Initial Steps
1.
Complete the steps in the Prepare the Machine for Maintenance
section of this document to ensure that the machine is in a safe state for
maintenance.
The machine must be powered down and the site's Lockout/Tagout
procedure executed during this procedure to ensure personal safety.
2.
Remove the FlexJet Head from the machine. Refer to the Removing a
FlexJet Head procedure located in this document.
3.
Remove the Plate and Baffle (flexible strip) from the bottom of the
head and stand the FlexJet Head Assembly in a vertical position in
order to access the Z Stop Brake from the side.