Change the Belt
1.
Remove the screw securing the Belt Clamp to the Arm Spring. Refer
to the following diagram.
Timing Altered Belt
Belt Clamp
Screw
Arm Spring
2.
Remove the damaged Timing Altered Belt.
3.
Install the new Timing Altered Belt onto the pulleys. Assemble the
Belt Clamp to the Arm Spring to secure the Timing Altered Belt.
4.
Verify/adjust the belt tension using the Adjusting the Z-Axis Spindle
Drive Belt Tension procedure located in this document.
Final Steps
1.
Mount the FlexJet Head on the machine. Refer to the Installing a
FlexJet Head procedure located in this document.
2.
Complete the steps in the Prepare the Machine for Production section
of this document to ensure that the machine is in a safe operational
state. Verify that all covers removed for maintenance are installed,
including the safety covers below the hinged covers and the FlexJet
Head Cover.
3.
Perform Spindle Height Calibration. Refer to the Calibration, CPE
and Measurement manual.
4.
Perform CPE. Refer to the Calibration, CPE and Measurement
manual.