5.5.4 Dry mortarless installation with fire batt
Dry mortarless installation with fire batt into a solid wall
Fig. 28: Dry mortarless installation with fire batt into a solid wall
1
FKR-EU
2.4
Coated board system
3.1
Solid wall
4.1
Solid ceiling slab
Z
Spigot construction 370 mm
Flange construction 342 mm
*
Installation near the floor analogous to
Up to EI 60 S
Dry mortarless installation with fire batt in solid wall, "flange to flange"
Fig. 29: Dry mortarless installation into a solid wall, with a fire batt, flange to flange, illustration shows side by side
installation (applies also to installation of dampers on top of each other)
1
FKR-EU
2.4
Coated board system
3.1
Solid wall
4.1
Solid ceiling slab
Z
Spigot construction 370 mm
Flange construction 342 mm
s2
Spigot construction 40 – 600 mm
Flange construction 80 – 600 mm
*
Installation near the floor analogous to
Up to EI 60 S
Installation
Solid walls > Dry mortarless installation with fire batt
Fire damper FKR-EU
45
Summary of Contents for FKR-EU
Page 162: ...Fire damper FKR EU 162 ...
Page 163: ...Fire damper FKR EU 163 ...
Page 164: ...Fire damper FKR EU 164 ...