Half-timbered wall
Fig. 61: Mortar-based installation – multiple occupancy of an installation opening in half-timbered construction
1
FKR-EU
2.1
Mortar
3.5
Half-timbered construction, cladding on both
sides
6.8
Infill (cavities completely filled with mineral wool
≥
1000 °C,
≥
50 kg/m³, or bricks, aerated con-
crete, lightweight concrete, reinforced concrete or
clay)
7.9
Timber structure
7.11
Trim panels, double layer with staggered joints,
fire-resistant
Z
Spigot construction 370 mm
Flange construction 342 mm
s2
Spigot construction 40 – 225 mm
Flange construction 80 – 225 mm
Up to EI 90 S
Installation