6.5.1.8 Thermal overload element THR
The testing circuit is shown in Figure 6.5.12.
Single-phase
current
source
A
TB 1 -1
-2
I a
GRT100
Monitoring
jack
A
0V
TB 4 - A16
- A17
E
DC
power
supply
Time
counter
Start
Stop
OV
Figure 6.5.12 Testing THR (Model 100s, 200s)
This test is performed using time-shortened output signals because the operating time is in the
order of minutes. The operating time of the time-shortened signals is one sixtieth that of the
regular signals.
The time-shortened output signal number of the THR element is as follows:
Element
Signal number
Remarks
THR-A_TEST
88
Alarm
THR-S_TEST
84
Trip
The short-time testing procedure is as follows:
Set the relay :
= 60.0min, k = 1.30, I
B
= 1.00, I
P
= 0.80, T
A
= 10min
Press 4 (= Logic circuit) on the "Test" sub-menu screen to display the "Logic circuit"
screen.
Enter a signal number to observe the THR short-time output at monitoring jack A and
press the
ENTER
key.
Apply a test current to 200% of the rated current and measure the operating time.
Check that the measured operating time is within
10% of the following value.
Element
Operating time (
10%)
THR-A
11.5s (10.3s – 12.7s)
THR-S
22.5s (20.2s – 24.8s)
Summary of Contents for GRT100 Series
Page 142: ... 141 6 F 2 S 0 7 8 9 Appendix A Block Diagram ...
Page 144: ... 143 6 F 2 S 0 7 8 9 Appendix B Signal List ...
Page 159: ... 158 6 F 2 S 0 7 8 9 ...
Page 160: ... 159 6 F 2 S 0 7 8 9 Appendix C Variable Timer List ...
Page 162: ... 161 6 F 2 S 0 7 8 9 Appendix D Binary Output Default Setting List ...
Page 165: ... 164 6 F 2 S 0 7 8 9 ...
Page 166: ... 165 6 F 2 S 0 7 8 9 Appendix E Details of Relay Menu and LCD and Button Operation ...
Page 174: ... 173 6 F 2 S 0 7 8 9 Appendix F Case Outline Flush Mount Type Rack Mount Type ...
Page 179: ... 178 6 F 2 S 0 7 8 9 ...
Page 180: ... 179 6 F 2 S 0 7 8 9 Appendix G External Connections ...
Page 185: ... 184 6 F 2 S 0 7 8 9 ...
Page 200: ... 199 6 F 2 S 0 7 8 9 ...
Page 201: ... 200 6 F 2 S 0 7 8 9 Appendix J Return Repair Form ...
Page 205: ... 204 6 F 2 S 0 7 8 9 Customer Name Company Name Address Telephone No Facsimile No Signature ...
Page 206: ... 205 6 F 2 S 0 7 8 9 ...
Page 207: ... 206 6 F 2 S 0 7 8 9 Appendix K Technical Data ...
Page 220: ... 219 6 F 2 S 0 7 8 9 ...
Page 221: ... 220 6 F 2 S 0 7 8 9 Appendix M Symbols Used in Scheme Logic ...
Page 224: ... 223 6 F 2 S 0 7 8 9 ...
Page 225: ... 224 6 F 2 S 0 7 8 9 Appendix N Implementation of Thermal Model to IEC60255 8 ...
Page 228: ... 227 6 F 2 S 0 7 8 9 ...
Page 229: ... 228 6 F 2 S 0 7 8 9 Appendix O IEC60870 5 103 Interoperability and Troubleshooting ...
Page 241: ... 240 6 F 2 S 0 7 8 9 Appendix P Modbus Interoperability ...
Page 255: ... 254 6 F 2 S 0 7 8 9 ...
Page 256: ... 255 6 F 2 S 0 7 8 9 Appendix Q Inverse Time Characteristics ...
Page 259: ... 258 6 F 2 S 0 7 8 9 ...
Page 260: ... 259 6 F 2 S 0 7 8 9 Appendix R Failed Module Tracing and Replacement ...
Page 266: ... 265 6 F 2 S 0 7 8 9 Appendix S Ordering ...
Page 269: ... 268 6 F 2 S 0 7 8 9 3 1 Oct 2 2017 Republished under spin off company ...
Page 270: ......