
Injection Molding Machine Chapter 4
V3.0
4-13
2.5 Ejector setting
Press
HOT key or use the direction key in the main menu to move cursor to EJECTION
then press ENTER to display ejector screen.
FWD.1
FWD.2
FWD. END
PT mm
P bar
V %
V1: 0/ 0
0/ 0
V2:
0/ 0
P1: 0/ 0
P2:
100.0mm
100.0mm
110.0mm
0.2mm
ACTION STATUS
M:
14D05M10Y
10h25m10s
20°C
5W
EJECT FUNCTION
EJECT SHAKING
ON
OFF
30
0.5
10
40
25.0
90
100
80.0
140
PARAMETER
EJECT.
F2
F1
F3
F4
F5
F6
F7
F8
MOLD ADJ.
CORE
LOG
SUPPORT
MENU
02
I/O
RET.END
RET.2
OFF
PRODUCT SENSOR
EJECT RET. MID. PT.
< 60.0>
CHANGE
MOLD
EXTERN
PROD.
MANAG.
C
B
A
F
30
RET.1
50
10.0
0.2
DELAY
COUNT
0.2
0.3
4
3
ROBOT CYCLE TIME
G
< 60.0>
D
E
Screen 4-8
A
EJECT FUNCTION
:
Set on to run ejector process.
B
EJECT SHAKING
:
To run ejector shaking sequences
,
set EJECT RET. MID. PT. a little
smaller than FWD END position
,
ejector will move forward to FWD. END and then move
backward to EJECT RET. MID. PT. until EJECT COUNT is reached. This process will
make ejector move forward and backward quickly to shake parts down.(No need to set
the function on)
C
PRODUCT SENSOR
:
Photo sensing device is used to confirm dropped parts. It is an
OPTIONAL DEVICE.
D
EJECT COUNT
: FWD.1 1
2 FWD.1
RET.1 3 PT.
1
EJECT RET. 2
MID. PT 3
4
RET. END PT.
BILL 2010/09/27
Summary of Contents for TMC 1000E
Page 20: ...Injection Molding Machine Chapter 2 2 4 V3 0 2 Machine dimensions ...
Page 21: ...Injection Molding Machine Chapter 2 2 5 V3 0 3 Operating position ...
Page 22: ...Injection Molding Machine Chapter 2 2 6 V3 0 4 Safety devices layouts ...
Page 23: ...Injection Molding Machine Chapter 2 2 7 V3 0 5 Position of signs and labels ...
Page 75: ...Injection Molding Machine Chapter 4 V3 0 4 32 starts running to cool down barrel ...
Page 132: ...Injection Molding Machine Chapter 6 V3 0 6 11 4 3 Lubrication points and timing ...
Page 136: ...Injection Molding Machine Chapter 6 V3 0 6 15 32 061 120 3141 Nozzle head S45C PCS 1 ...
Page 149: ...Injection Molding Machine Appendix A A 4 V3 0 1 4 INJECTION INJECTION ...
Page 150: ...Injection Molding Machine Appendix A A 5 V3 0 ...
Page 151: ...Injection Molding Machine Appendix A A 6 V3 0 1 5 CHARGING ...
Page 152: ...Injection Molding Machine Appendix A A 7 V3 0 If CARRIAGE MOVEMENT ON then CARRIAGE RETRACT ...
Page 153: ...Injection Molding Machine Appendix A A 8 V3 0 1 6 CLAMP OPENING ...
Page 159: ...Injection Molding Machine Appendix A A 14 V3 0 1 9 2 GAS VENT SEQUENCE ...
Page 160: ...Injection Molding Machine Appendix A A 15 V3 0 1 9 3 INJECTION COMPRESSION SEQUENCE ...
Page 161: ...Injection Molding Machine Appendix A A 16 V3 0 1 9 4 GAS VENT INJECTION COMPRESSION ...