Injection Molding Machine Chapter 6
V3.0
6-5
3
Cleaning
3.1 Screw removal/installation and cleaning
Procedures for removing the screw for cleaning are:
A) Carriage retract all the way back
,
adjust mold thickness to
maximum
,
injection to end
,
clamp open to maximum
,
temperature still maintained.
B) Remove screw lock ring from quill
C) Remove the barrel end cap
D) Suck back to pull out the screw from quill
E) Use copper bar or non-metal object to push the part between screw
and coupling (quill) to eject the screw out of the barrel with
injection operation.
F) Draw the screw away from the barrel from between fixed platen
and movable platen.
Procedures for installing the screw back in the barrel after screw is
cleaned are:
A) Install the screw into the barrel from between fixed platen and
moving platen.
B) Use copper bar or non-metal object to push the part between screw
head and movable platen to hit the screw into the barrel with
clamp close operation.
C) Install screw into coupling (quill) and lock up screw pressing
cover.
D) Clean the contact surface between barrel end cap and barrel
,
apply anti-rusting agent on the bolt and tighten it up
symmetrically and evenly.
E) Install heater band and thermocouple.
Screw locking ring
Barrel head
Summary of Contents for TMC 1000E
Page 20: ...Injection Molding Machine Chapter 2 2 4 V3 0 2 Machine dimensions ...
Page 21: ...Injection Molding Machine Chapter 2 2 5 V3 0 3 Operating position ...
Page 22: ...Injection Molding Machine Chapter 2 2 6 V3 0 4 Safety devices layouts ...
Page 23: ...Injection Molding Machine Chapter 2 2 7 V3 0 5 Position of signs and labels ...
Page 75: ...Injection Molding Machine Chapter 4 V3 0 4 32 starts running to cool down barrel ...
Page 132: ...Injection Molding Machine Chapter 6 V3 0 6 11 4 3 Lubrication points and timing ...
Page 136: ...Injection Molding Machine Chapter 6 V3 0 6 15 32 061 120 3141 Nozzle head S45C PCS 1 ...
Page 149: ...Injection Molding Machine Appendix A A 4 V3 0 1 4 INJECTION INJECTION ...
Page 150: ...Injection Molding Machine Appendix A A 5 V3 0 ...
Page 151: ...Injection Molding Machine Appendix A A 6 V3 0 1 5 CHARGING ...
Page 152: ...Injection Molding Machine Appendix A A 7 V3 0 If CARRIAGE MOVEMENT ON then CARRIAGE RETRACT ...
Page 153: ...Injection Molding Machine Appendix A A 8 V3 0 1 6 CLAMP OPENING ...
Page 159: ...Injection Molding Machine Appendix A A 14 V3 0 1 9 2 GAS VENT SEQUENCE ...
Page 160: ...Injection Molding Machine Appendix A A 15 V3 0 1 9 3 INJECTION COMPRESSION SEQUENCE ...
Page 161: ...Injection Molding Machine Appendix A A 16 V3 0 1 9 4 GAS VENT INJECTION COMPRESSION ...