
Injection Molding Machine Chapter 5
V3.0
5-12
Content of Alarm
Cause of Alarm
Release of Alarm
36.
Robot connection
error
Please check robot
input I/O222
S
/
A
: T/C 326 time counting
completed I/O 222 OFF
1.
Open safety gate
2.
Adjust T/C 326 set value
3.
Check robot
37.
Auto mold adjustment
not finish
Please check die height
adjustment
M
: function not selected
before operation or set
value improperly
1.
Open safety gate
2.
Adjust die height
adjustment set value
3.
Check mold actual
condition
38.
Auto mold adjustment
finished
M
:
Auto mold adjustment
completed
1.
Open safety gate
39. E
mergency circuit is
opened
Check emergency
circuit
M/S
/
A
: front or rear
emergency stop
button is pressed or
side gate on clamp
side or rear
operation gate is
opened.
1.
Open safety gate
2.
Release emergency stop
button
3. Close side door
,
e.g.
,
rear
operation gate.
41.
Motor
Ì
not confirm
IO 231
,
IO 232
M/S/A:
after pump motor is
“ON” I/O 231
,
I/O
232 is not ON
1.
Open safety gate
2.
Check motor circuit
71. T
emperature over
danger point
M/S
/
A
: Actual temperature
Exceeding
dangerous
temperature
1. O
pen safety gate
4.
Check temperature set value
3. Check temperature control
circuit
Summary of Contents for TMC 1000E
Page 20: ...Injection Molding Machine Chapter 2 2 4 V3 0 2 Machine dimensions ...
Page 21: ...Injection Molding Machine Chapter 2 2 5 V3 0 3 Operating position ...
Page 22: ...Injection Molding Machine Chapter 2 2 6 V3 0 4 Safety devices layouts ...
Page 23: ...Injection Molding Machine Chapter 2 2 7 V3 0 5 Position of signs and labels ...
Page 75: ...Injection Molding Machine Chapter 4 V3 0 4 32 starts running to cool down barrel ...
Page 132: ...Injection Molding Machine Chapter 6 V3 0 6 11 4 3 Lubrication points and timing ...
Page 136: ...Injection Molding Machine Chapter 6 V3 0 6 15 32 061 120 3141 Nozzle head S45C PCS 1 ...
Page 149: ...Injection Molding Machine Appendix A A 4 V3 0 1 4 INJECTION INJECTION ...
Page 150: ...Injection Molding Machine Appendix A A 5 V3 0 ...
Page 151: ...Injection Molding Machine Appendix A A 6 V3 0 1 5 CHARGING ...
Page 152: ...Injection Molding Machine Appendix A A 7 V3 0 If CARRIAGE MOVEMENT ON then CARRIAGE RETRACT ...
Page 153: ...Injection Molding Machine Appendix A A 8 V3 0 1 6 CLAMP OPENING ...
Page 159: ...Injection Molding Machine Appendix A A 14 V3 0 1 9 2 GAS VENT SEQUENCE ...
Page 160: ...Injection Molding Machine Appendix A A 15 V3 0 1 9 3 INJECTION COMPRESSION SEQUENCE ...
Page 161: ...Injection Molding Machine Appendix A A 16 V3 0 1 9 4 GAS VENT INJECTION COMPRESSION ...