
Injection Molding Machine Chapter 4
V3.0
4-4
Press any key to display the screen of maintenance checklist:
V1: 0/ 0
0/ 0
V2:
0/ 0
P1: 0/ 0
P2:
100.0mm
100.0mm
110.0mm
1.0mm
ACTION STATUS
M:
03D05M07Y
10h250m10s
20°C
3W
DAILY CHECK & MAINTENANCE
F2
F1
F3
F4
F5
F6
F7
F8
MENU
17
MAINTEN.
SUPPORT
I/O
MAINT.
LIST
1.PUSH EMERGENCY BUTTON TO CHECK PUMP STOP.
3.CK. SAFETY DROP BAR MOVES SMOOTH.
4.CK. BARREL COVER IS FIXED.
5.CK. LUB. OF MOVING PARETS ARE OK.
10.CK.HYD.& LUB.OIL ARE ENOUGH.(NO RECYCLE OIL)
7.CK. COLD START PROTECT. TIME AND DANGER
8.CK. TEMP. SET OF HYD. OIL & COLLAR ARE OK.
9.CK IF PUMP HAS ANY NOISE.
6.CK. NO PARTS IS LOOSENED OR ABNORMAL.
11.CK. NO HOSE/PIPE IS LOOSENED/LEAKING.
12.CK. NO AIR IS BLENDED INTO HYD. SYSTEM.
13.CK. ALL GROUDINGS ARE CONNECTED OK.
14.CK. MOLD CLAMP ARE TIGHT.
15.CK. MOLD PROTECTION DEVICE IS OK.
2.CK.NO LEAKING IN HYD. SYSTEM.
1.CK.AND CLEAN HYD. FILTER.
3.CK.AND CLEAN OIL COOLER.
4.CK.NO MOVING PARTS ARE LOOSENED.
5.CK.AND CLEAN ELECTRIC CABINET.
6.TIGHT ALL WIRING TERMALS.
8.TEST PRESS. AND SPEED LINEARILITY.
7.CLEAN AND ADJUST ALL
9.CLEAN WASTE OIL.
HALF YEARLY CHECK AND MAINTENANCE
1.CK.PALTEN'S PARALLELISM.
2.CHANGE HYD. SYSTEM OIL.
3.CK.SCREW/BARREL FUNCTION WELL.
4.MACHINE LEVELING ADJUST.
MONTHLY CHECK & MAINTENANCE
LOG
MOLD
EXTERN
TEMP. SET OK.
THERMOCOUPLES.
2.CK. I/O 101,103,109 FUNCTION BY OPEN/CLOSE DOOR.
Screen 4-2
★
Users must perform all the inspections in accordance with the inspection items on this
screen thus ensuring the safety of the machine and operator.
Summary of Contents for TMC 1000E
Page 20: ...Injection Molding Machine Chapter 2 2 4 V3 0 2 Machine dimensions ...
Page 21: ...Injection Molding Machine Chapter 2 2 5 V3 0 3 Operating position ...
Page 22: ...Injection Molding Machine Chapter 2 2 6 V3 0 4 Safety devices layouts ...
Page 23: ...Injection Molding Machine Chapter 2 2 7 V3 0 5 Position of signs and labels ...
Page 75: ...Injection Molding Machine Chapter 4 V3 0 4 32 starts running to cool down barrel ...
Page 132: ...Injection Molding Machine Chapter 6 V3 0 6 11 4 3 Lubrication points and timing ...
Page 136: ...Injection Molding Machine Chapter 6 V3 0 6 15 32 061 120 3141 Nozzle head S45C PCS 1 ...
Page 149: ...Injection Molding Machine Appendix A A 4 V3 0 1 4 INJECTION INJECTION ...
Page 150: ...Injection Molding Machine Appendix A A 5 V3 0 ...
Page 151: ...Injection Molding Machine Appendix A A 6 V3 0 1 5 CHARGING ...
Page 152: ...Injection Molding Machine Appendix A A 7 V3 0 If CARRIAGE MOVEMENT ON then CARRIAGE RETRACT ...
Page 153: ...Injection Molding Machine Appendix A A 8 V3 0 1 6 CLAMP OPENING ...
Page 159: ...Injection Molding Machine Appendix A A 14 V3 0 1 9 2 GAS VENT SEQUENCE ...
Page 160: ...Injection Molding Machine Appendix A A 15 V3 0 1 9 3 INJECTION COMPRESSION SEQUENCE ...
Page 161: ...Injection Molding Machine Appendix A A 16 V3 0 1 9 4 GAS VENT INJECTION COMPRESSION ...